A semi-infinite programming model for earliness tardiness production planning with a genetic algorithm

被引:24
|
作者
Wang, DW [1 ]
Fang, SC [1 ]
机构
[1] N CAROLINA STATE UNIV, RALEIGH, NC 27695 USA
关键词
production planning; earliness/tardiness schedule; genetic algorithm; semi-infinite programming;
D O I
10.1016/0898-1221(96)00034-X
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
To closely describe the earliness/tardiness production planning problems in the JIT environment, a nonlinear semi-infinite programming model is proposed. Due to the issues of nonconvexivity and having infinitely many constraints, instead of applying traditional optimization approaches, a specially designed genetic algorithm with mutation along the negative gradient direction is developed. The proposed algorithm is a combination of the steepest descent method with the stochastic sampling algorithm. Some numerical results are included to show its potential for industrial applications.