A goal programming model for balancing agent loads in the multi-resource generalized assignment problem

被引:1
|
作者
Ozcelik, Feristah [1 ]
Sarac, Tugba [1 ]
机构
[1] Eskisehir Osmangazi Univ, Dept Ind Engn, TR-26480 Eskisehir, Turkey
关键词
Multi-Resource generalized assignment problem; load balancing; goal programming; matheuristic algorithm; GENETIC ALGORITHM; MULTIRESOURCE; ALLOCATION;
D O I
10.17341/gazimmfd.789915
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The multi-resource generalized assignment problem (MRGAP) is the assignment of jobs to agents under capacity constraints to minimize the total assignment. In this problem, each agent has multiple resources, each job is assigned to only one agent, and multiple jobs can be assigned to one agent. In the MRGAP problem, it is essential to distribute the loads in balance to the agents. In the literature, for balancing agent loads, bottleneck MRGAP with the aim of minimizing the maximum agent load, and balanced assignment MRGAP models with the aim of minimizing the difference between the maximum agent load and the minimum agent load have been proposed. In this study, the sum of load squares model has been adapted for MRGAP, as well as a new goal programming MRGAP model and a matheuristic algorithm for the solution of this model are developed. The performances of the proposed model and the algorithm were compared with the models taken from the literature by using randomly derived test problems. The quality of the obtained solutions is determined by considering the maximum load, coefficient of variation and total load criteria. The test results are evaluated in terms of these three criteria. The results obtained revealed the success of the proposed goal programming model and the matheuristic algorithm.
引用
收藏
页码:193 / 205
页数:13
相关论文
共 50 条
  • [1] Heuristics for the multi-resource generalized assignment problem
    Mazzola, JB
    Wilcox, SP
    NAVAL RESEARCH LOGISTICS, 2001, 48 (06) : 468 - 483
  • [2] ALGORITHMS FOR THE MULTI-RESOURCE GENERALIZED ASSIGNMENT PROBLEM
    GAVISH, B
    PIRKUL, H
    MANAGEMENT SCIENCE, 1991, 37 (06) : 695 - 713
  • [3] The multi-resource agent bottleneck generalised assignment problem
    Karsu, Ozlem
    Azizoglu, Meral
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (02) : 309 - 324
  • [4] Stochastic Bottleneck Multi-Resource Generalized Assignment Problem
    Sarac, Tugba
    Ozcelik, Feristah
    JOURNAL OF POLYTECHNIC-POLITEKNIK DERGISI, 2024, 27 (02):
  • [5] A multi-start iterated tabu search algorithm for the multi-resource agent bottleneck generalized assignment problem
    Bektur, Gulcin
    INTERNATIONAL JOURNAL OF OPTIMIZATION AND CONTROL-THEORIES & APPLICATIONS-IJOCTA, 2020, 10 (01): : 37 - 46
  • [6] A path relinking approach for the multi-resource generalized quadratic assignment problem
    Yagiura, Mutsunori
    Komiya, Akira
    Kojima, Kenya
    Nonobe, Koji
    Nagamochi, Hiroshi
    Ibaraki, Toshihide
    Glover, Fred
    ENGINEERING STOCHASTIC LOCAL SEARCH ALGORITHMS: DESIGNING, IMPLEMENTING AND ANALYZING EFFECTIVE HEURISTICS, 2007, 4638 : 121 - +
  • [7] Capacity planning by the dynamic multi-resource generalized assignment problem (DMRGAP)
    Tel Aviv Univ, Tel Aviv, Israel
    Eur J Oper Res, 1 (91-99):
  • [8] Capacity planning by the dynamic multi-resource generalized assignment problem (DMRGAP)
    Shtub, A
    Kogan, K
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 105 (01) : 91 - 99
  • [9] A very large-scale neighborhood search algorithm for the multi-resource generalized assignment problem
    Yagiura, Mutsunori
    Iwasaki, Shinji
    Ibaraki, Toshihide
    Glover, Fred
    Discrete Optimization, 2004, 1 (01) : 87 - 98
  • [10] Generalized assignment type goal programming problem:: Application to nurse scheduling
    Ferland, JA
    Berrada, I
    Nabli, I
    Ahiod, B
    Michelon, P
    Gascon, V
    Gagné, É
    JOURNAL OF HEURISTICS, 2001, 7 (04) : 391 - 413