An empirical survey of the motives and benefits of adopting guaranteed maximum price and target cost contracts in construction

被引:39
|
作者
Chan, Daniel W. M. [2 ]
Chan, Albert P. C. [2 ]
Lam, Patrick T. I. [2 ]
Wong, James M. W. [1 ]
机构
[1] Univ Hong Kong, Dept Civil Engn, Hong Kong, Hong Kong, Peoples R China
[2] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Hong Kong, Peoples R China
关键词
Guaranteed maximum price; Target cost contracting; Motives; Benefits; Hong Kong;
D O I
10.1016/j.ijproman.2010.04.002
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In light of increasing project complexity, constraints on programme schedule and limited budget, there exists a strong call for changes in contracting procedures in construction. Both the Guaranteed Maximum Price (GMP) and Target Cost Contracting (TCC) approaches with a gain-share/pain-share arrangement have been advocated to achieve better value for money and more satisfactory project performance. This paper aims to review the prevailing practices of GMP/TCC in general, and explore the motives and benefits of implementing the GMP/TCC scheme in comparison with the traditional fixed-price lump-sum contract in particular. The research study is based on a comprehensive literature review and an industry-wide empirical questionnaire survey for evaluating the relative importance of motives and benefits associated with GMP/TCC in Hong Kong. The survey data collected from 45 valid completed questionnaires were analysed using the mean score ranking technique, Kendall's concordance test, Spearman's rank correlation test and one-way ANOVA test. The perceived benefits were measured and ranked from the perspectives of the client, contractor and consultant for cross-comparison. The survey findings indicated that the three most common motives of clients behind their decision of adopting GMP/TCC include: (1) to generate an incentive for contractor to achieve cost saving; (2) to develop better working relationship within the project team; and (3) to tap in contractor's expertise in design and innovation. The top three perceived benefits of applying GMP/TCC were found to be: (1) early settlement of final project account; (2) improved partners' working relationship under a partnering arrangement; and (3) capability of integrating contractor's expertise in building designs and innovations prior to construction. The research results are particularly essential in assisting key project stakeholders to realise the potential benefits derived from the use of GMP/TCC contracts and in generating more useful insights into alternative integrated contracting strategies for the construction industry, so as to drive for excellence in overall project performance. (C) 2010 Elsevier Ltd. and IPMA. All rights reserved.
引用
收藏
页码:577 / 590
页数:14
相关论文
共 23 条
  • [1] Empirical Study of the Risks and Difficulties in Implementing Guaranteed Maximum Price and Target Cost Contracts in Construction
    Chan, Daniel W. M.
    Chan, Albert P. C.
    Lam, Patrick T. I.
    Wong, James M. W.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (05) : 495 - 507
  • [2] Developing a fuzzy risk assessment model for guaranteed maximum price and target cost contracts in construction
    Chan, Joseph
    Chan, Daniel
    Chan, Albert
    Lam, Patrick
    Yeung, John
    JOURNAL OF FACILITIES MANAGEMENT, 2011, 9 (01) : 34 - +
  • [3] Risk mitigation strategies for guaranteed maximum price and target cost contracts in construction A factor analysis approach
    Chan, Joseph
    Chan, Daniel
    Chan, Albert
    Lam, Patrick
    JOURNAL OF FACILITIES MANAGEMENT, 2012, 10 (01) : 6 - +
  • [4] Project Cost Implications of Competitive Guaranteed Maximum Price Contracts
    Tran, Dai Q.
    Brihac, Alex
    Nguyen, Long D.
    Kwak, Young Hoon
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2018, 34 (02)
  • [5] A CRITICAL STUDY OF RISK ALLOCATION IN GUARANTEED MAXIMUM PRICE AND TARGET COST CONTRACTS IN HONG KONG
    Chan, Joseph H. L.
    Chan, Daniel W. M.
    Lam, Patrick T. I.
    PROCEEDINGS OF THE SECOND INTERNATIONAL POSTGRADUATE CONFERENCE ON INFRASTRUCTURE AND ENVIRONMENT, VOL 1, 2010, : 205 - 215
  • [6] Developing a fuzzy risk assessment model for guaranteed maximum price and target cost contracts in South Australia
    Chan, Daniel
    Chan, Joseph
    Ma, Tony
    FACILITIES, 2014, 32 (11-12) : 624 - 646
  • [7] Evaluating Guaranteed Maximum Price and Target Cost Contracting Strategies in Hong Kong Construction Industry
    Chan, Daniel
    Chan, Albert
    Lam, Patrick
    Lam, Edmond
    Wong, James
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2007, 12 (03) : 139 - +
  • [8] Risk management in guaranteed maximum price (GMP) contracts
    Palihakkara, Asha Dulanjalie
    Perera, B. A. K. S.
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2022, 11 (02) : 368 - 386
  • [9] Current Practices in the Development of Guaranteed Maximum Price (GMP) Contracts
    Ogundare, Tolulope I.
    Kassa, Rebecca
    Maali, Omar
    Lines, Brian
    Smithwick, Jake
    Sullivan, Kenneth
    CONSTRUCTION RESEARCH CONGRESS 2024: CONTRACTING, DELIVERY, SCHEDULING, ESTIMATING, ECONOMICS, AND ORGANIZATIONAL MANAGEMENT AND PLANNING IN CONSTRUCTION, 2024, : 146 - 154
  • [10] Benefits and Challenges of Adopting SAFe - An Empirical Survey
    Putta, Abheeshta
    Uludag, Omer
    Paasivaara, Maria
    Hong, Shun-Long
    AGILE PROCESSES IN SOFTWARE ENGINEERING AND EXTREME PROGRAMMING (XP 2021), 2021, 419 : 172 - 187