Bernoulli production lines with quality-quantity coupling machines: monotonicity properties and bottlenecks

被引:38
|
作者
Meerkov, Semyon M. [1 ]
Zhang, Liang [1 ]
机构
[1] Univ Michigan, Dept Elect Engn & Comp Sci, Ann Arbor, MI 48109 USA
关键词
Production lines; Bernoulli reliability and quality models; Quality-quantity coupling; SERIAL PRODUCTION LINES; SYSTEM;
D O I
10.1007/s10479-009-0526-3
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Serial production lines with machines having their quality parameters monotonically decreasing as a function of their efficiencies are analyzed. The Bernoulli reliability and quality models are assumed. It is shown that in such systems the production rate of good parts is a non-monotonic function with respect to machine efficiencies. Thus, bottlenecks may be eliminated by either increasing or decreasing machine efficiency, depending on the operating point.
引用
收藏
页码:119 / 131
页数:13
相关论文
共 30 条
  • [1] Bernoulli production lines with quality-quantity coupling machines: monotonicity properties and bottlenecks
    Semyon M. Meerkov
    Liang Zhang
    Annals of Operations Research, 2011, 182 : 119 - 131
  • [2] Product quality inspection in Bernoulli lines: analysis, bottlenecks, and design
    Meerkov, Semyon M.
    Zhang, Liang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (16) : 4745 - 4766
  • [3] Lean buffering in serial production lines with Bernoulli machines
    Hu, A. B.
    Meerkov, S. M.
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2006, 2006
  • [4] Transient behavior of serial production lines with Bernoulli machines
    Meerkov, Semyon M.
    Zhang, Liang
    IIE TRANSACTIONS, 2008, 40 (03) : 297 - 312
  • [5] Operations Sequencing in Flexible Production Lines With Bernoulli Machines
    Zhang, Liang
    Yue, Xiaohang
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2011, 8 (03) : 645 - 653
  • [6] Dynamic Bottleneck in Serial Production Lines with Bernoulli Machines
    Tu, Jiachen
    Bai, Yishu
    Yang, Mengzhuo
    Zhang, Liang
    Denno, Peter
    2019 IEEE 15TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2019, : 79 - 84
  • [7] Identifying Bottlenecks in Serial Production Lines with Geometric Machines: Indicators and Rules
    Kang, Yunyi
    Ju, Feng
    IFAC PAPERSONLINE, 2017, 50 (01): : 13952 - 13957
  • [8] Reducing energy consumption in serial production lines with Bernoulli reliability machines
    Su, Wen
    Xie, Xiaolei
    Li, Jingshan
    Zheng, Li
    Feng, Shaw C.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (24) : 7356 - 7379
  • [9] Energy-efficient on/off control in serial production lines with Bernoulli machines
    Wang, Xiaohan
    Dai, Yaping
    Jia, Zhiyang
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2024, 36 (01) : 103 - 128
  • [10] Energy-efficient on/off control in serial production lines with Bernoulli machines
    Xiaohan Wang
    Yaping Dai
    Zhiyang Jia
    Flexible Services and Manufacturing Journal, 2024, 36 : 103 - 128