Simulation of construction shape-forming process of cable domes

被引:4
|
作者
Ye JiHong [1 ]
Feng RuoQiang [1 ]
Kan Yuan [1 ]
机构
[1] Southeast Univ, Key Lab Concrete & Prestressed Concrete Struct, Minist Educ, Nanjing 210096, Jiangsu, Peoples R China
关键词
cable domes; force control of construction process; form control of construction process; imbalance force iterative method; dynamic relaxation method; construction shape-forming process experiment; TENSEGRITY STRUCTURES; ALGORITHM; SYSTEMS;
D O I
10.1007/s11431-011-4666-8
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A cable dome has no stiffness or load carrying capacity unless it has been prestressed. Analyses of cable domes are based on successful prestressing designs, making force finding analysis very important. A new force finding method named the imbalance force iterative method is proposed, which can overcome some limitations of the integrity feasible prestressing method. For instance, even if groups are assigned by mistake, the pretension distribution that satisfies the known geometry form can also be found. This method possess good stability and calculation efficiency, and a case study indicates that it is applicable to the force finding of large and complicated cable domes. On the other hand, form finding analysis of cable domes is also a key engineering problem. However, rigid displacement occurs in this process, which makes the analysis more complex. In this paper, the dynamic relaxation method was selected, and the problem of rigid displacement was therefore effectively solved. The method includes two steps: first, the stretching cables are released, and secondly, an axial force is imposed on the two ends of each released cable. This method is convenient in its calculation and clear in its conception. A case study indicates that the method is suitable for the simulation of the construction process of various cable domes and cable-strut tension structures. Moreover, a form finding experiment was conducted on a model of a cable dome with a diameter of 4.8 m by tensing diagonal cables. The behavior of the model in the form finding process was investigated. The experimental results indicate that the initial lengths of members and prestress loss are key issues in cable domes design. The results also prove that the methods of form finding and force finding proposed in this paper are reliable and effective.
引用
收藏
页码:101 / 116
页数:16
相关论文
共 50 条
  • [1] Simulation of construction shape-forming process of cable domes
    JiHong Ye
    RuoQiang Feng
    Yuan Kan
    Science China Technological Sciences, 2012, 55 : 101 - 116
  • [2] Simulation of construction shape-forming process of cable domes
    YE JiHongFENG RuoQiang KAN Yuan Key Laboratory of Concrete and PreStressed Concrete Structure of Ministry of EducationSoutheast UniversityNanjing China
    Science China(Technological Sciences), 2012, 55 (01) : 101 - 116
  • [4] Experimental study on the construction shape-forming process and static behaviour of a double strut cable dome
    Zhang, Ai-lin
    Sun, Chao
    Jiang, Zi-qin
    JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A, 2018, 19 (03): : 225 - 239
  • [5] Some experiences of shape-forming process: Experiments and numerical simulations
    Yoshida, S
    Kihara, S
    ENGINEERING COMPUTATIONS, 1996, 13 (2-4) : 98 - &
  • [6] SHAPE-FORMING AND DENSIFICATION OF CERAMIC SUPERCONDUCTORS
    PRAKASH, OM
    ANKLEKAR, RM
    KHOSLA, NK
    KUMAR, S
    CHAUDHURI, B
    THOMAS, CA
    MAGADUM, AP
    RAMESH, M
    RAO, BT
    MOHAN, TRR
    BULLETIN OF MATERIALS SCIENCE, 1991, 14 (04) : 1145 - 1150
  • [7] Colloidal isopressing: A new shape-forming method
    Yu, BC
    Lange, FF
    ADVANCED MATERIALS, 2001, 13 (04) : 276 - +
  • [8] Transformation of elements in combinatorial costume shape-forming
    Chuprina, N.
    Onyshchenko, S.
    NATIONAL ACADEMY OF MANAGERIAL STAFF OF CULTURE AND ARTS HERALD, 2013, (04): : 161 - 166
  • [9] Shape-forming analysis for cable-member structures based on geometric-displacement computation theory
    Su, Bo
    Qian, Ruojun
    Lin, Zhibin
    Hsi-An Chiao Tung Ta Hsueh/Journal of Xi'an Jiaotong University, 2007, 41 (11): : 1335 - 1337
  • [10] Construction Process Simulation of Cable Dome
    Zhang Jianhua
    Sun Ke
    ADVANCES IN STRUCTURAL ENGINEERING, PTS 1-3, 2011, 94-96 : 750 - +