Towards an engineering change management maturity grid

被引:12
作者
Storbjerg, Simon Haahr [1 ]
Brunoe, Thomas Ditlev [1 ]
Nielsen, Kjeld [1 ]
机构
[1] Aalborg Univ, Dept Mech & Mfg Engn, Aalborg, Denmark
关键词
Engineering change management; capability maturity model; maturity grid; design science method; MODEL;
D O I
10.1080/09544828.2016.1150967
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Engineering changes are inevitable, and their effective management (ECM) is essential in order for companies to sustain their competitiveness. The challenges in industry on ensuring an efficient ECM have been evident for years. The literature on ECM, however, falls short in giving comprehensive guidance for improvement. This article takes the first steps in developing a holistic maturity framework that is designed to guide improvement effort within ECM. The result of the development, an ECM maturity grid, is presented. The grid is a multilevel framework, and offers maturity assessment on a five-level scale, within five overall process areas, and 26 sub-process areas. A design science approach, aligned with a process for developing maturity grids, is followed to ensure a structured and deliberate approach. The paper contributes furthermore with a comprehensive overview of the critical success factors for an efficient ECM, which is used as basis for identifying the process areas of the maturity grid. Based on an industrial validation by 14 domain experts, it is concluded that the ECM maturity grid offers a valuable basis for providing targeted guidance on how to achieve an efficient ECM. Further development is, however, needed, for the grid to support maturity assessment.
引用
收藏
页码:361 / 389
页数:29
相关论文
共 45 条
[1]   Managing large engineering changes The case of a high-tech microlithography equipment manufacturer [J].
Alblas, A. A. ;
Wortmann, J. C. .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2012, 32 (11) :1252-1280
[2]  
[Anonymous], 2003, CMMI guidlines for process integration and product improvement
[3]   ENGINEERING CHANGE ADMINISTRATION - THE KEY ISSUES [J].
BALCERAK, KJ ;
DALE, BG .
COMPUTER INTEGRATED MANUFACTURING SYSTEMS, 1992, 5 (02) :125-132
[4]   Engineering change: a theoretical assessment and a case study [J].
Barzizza, R ;
Caridi, M ;
Cigolini, R .
PRODUCTION PLANNING & CONTROL, 2001, 12 (07) :717-726
[5]   Developing Maturity Models for IT Management - A Procedure Model and its Application [J].
Becker, Joerg ;
Knackstedt, Ralf ;
Poeppelbuss, Jens .
BUSINESS & INFORMATION SYSTEMS ENGINEERING, 2009, 1 (03) :213-+
[6]  
Bergsjo Dag, 2008, International Journal of Product Lifecycle Management, V3, P335, DOI 10.1504/IJPLM.2008.027010
[7]   Temporal representation and reasoning for workflow in engineering design change review [J].
Chinn, SJ ;
Madey, GR .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2000, 47 (04) :485-492
[8]  
COALLIER F, 1995, SOFTWARE PROCESS NEW, V2, P3
[9]   THE MANAGEMENT OF ENGINEERING CHANGE PROCEDURE [J].
DALE, BG .
ENGINEERING MANAGEMENT INTERNATIONAL, 1982, 1 (03) :201-208
[10]   Maturity and its impact on new product development project performance [J].
Dooley, K ;
Subra, A ;
Anderson, J .
RESEARCH IN ENGINEERING DESIGN, 2001, 13 (01) :23-29