An optimization-based approach for distributed project scheduling

被引:0
|
作者
Ni, M [1 ]
Luh, PB [1 ]
Moser, B [1 ]
机构
[1] Univ Connecticut, Dept Elect & Comp Engn, Storrs, CT 06269 USA
关键词
D O I
10.1109/ROBOT.2003.1241848
中图分类号
TP24 [机器人技术];
学科分类号
080202 ; 1405 ;
摘要
Pressed by market globalization, a recent trend for manufacturers is to have their design teams at different locations to better serve local markets and reduce design costs. Under the concurrent engineering paradigm, tasks in a design project are required to be performed in parallel, however, are often interdependent in a complex way. As a result, effective communication and coordination among teams become vital for a project to be successful. The complex interdependencies have not been adequately addressed in the literature. This paper presents a novel optimization formulation that explicitly models the interdependencies among tasks and the communication activities required. A solution methodology that combines Lagarangian relaxation and the surrogate subgradient method has been developed to solve the optimization problem that is inseparable. Backward/forward Dynamic programming is used to solve task subproblems. Numerical results demonstrate that complex dependencies among tasks are satisfied via communication activities, and near-optimal schedules are efficiently obtained.
引用
收藏
页码:1756 / 1761
页数:6
相关论文
共 50 条
  • [1] An optimization-based approach for design project scheduling
    Ni, Ming
    Luh, Peter B.
    Moser, Bryan
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2008, 5 (03) : 394 - 406
  • [2] An Optimization-Based Approach for Dynamic Actuator Scheduling in Distributed Processes Controlled Over Networks
    Xue, Da
    El-Farra, Nael H.
    2018 ANNUAL AMERICAN CONTROL CONFERENCE (ACC), 2018, : 1720 - 1725
  • [3] Particle swarm optimization-based approach for generator maintenance scheduling
    Koay, CA
    Srinivasan, D
    PROCEEDINGS OF THE 2003 IEEE SWARM INTELLIGENCE SYMPOSIUM (SIS 03), 2003, : 167 - 173
  • [4] Staffing a software project: A constraint satisfaction and optimization-based approach
    Barreto, Ahilton
    Barros, Marcio de O.
    Werner, Claudia M. L.
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (10) : 3073 - 3089
  • [5] Cat swarm Optimization-based schemes for resource-constrained project scheduling
    Xu, Long
    Hu, Wenbin
    ADVANCES IN MANUFACTURING TECHNOLOGY, PTS 1-4, 2012, 220-223 : 251 - 258
  • [6] Robust Optimization-based Genetic Algorithm for Project Scheduling with Stochastic Activity Durations
    Shou, Yongyi
    Wang, Wei
    INFORMATION-AN INTERNATIONAL INTERDISCIPLINARY JOURNAL, 2012, 15 (10): : 4049 - 4064
  • [7] Optimization-Based Actuator and Communication Scheduling in Networked Distributed Processes with Communication Delays
    Xue, Da
    El-Farra, Nael H.
    2019 AMERICAN CONTROL CONFERENCE (ACC), 2019, : 2558 - 2563
  • [8] Particle swarm optimization-based schemes for resource-constrained project scheduling
    Zhang, H
    Li, XD
    Li, H
    Huang, FL
    AUTOMATION IN CONSTRUCTION, 2005, 14 (03) : 393 - 404
  • [9] OPTIMIZATION-BASED METHODS FOR OPERATIONS SCHEDULING
    COHEN, AI
    SHERKAT, VR
    PROCEEDINGS OF THE IEEE, 1987, 75 (12) : 1574 - 1591
  • [10] An improved particle swarm optimization-based approach for production scheduling problems
    Zhao, Fuqing
    Mang, Qiuyu
    Yang, Yahong
    IEEE ICMA 2006: PROCEEDING OF THE 2006 IEEE INTERNATIONAL CONFERENCE ON MECHATRONICS AND AUTOMATION, VOLS 1-3, PROCEEDINGS, 2006, : 2279 - +