Decision Support and Optimization in Shutdown and Turnaround Scheduling

被引:26
|
作者
Megow, Nicole [1 ]
Moehring, Rolf H. [2 ]
Schulz, Jens [2 ]
机构
[1] Max Planck Inst Informat, D-66123 Saarbrucken, Germany
[2] Tech Univ Berlin, Inst Math, D-10623 Berlin, Germany
关键词
project management; planning; scheduling; resource constraints; risk analysis; applications; large-scale systems; chemical industries; COST TRADEOFF PROBLEM; CRITICAL-PATH; OFF PROBLEM; TIME; NETWORK; PERT; APPROXIMATION; COMPLEXITY;
D O I
10.1287/ijoc.1100.0393
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Large-scale maintenance in industrial plants requires the entire shutdown of production units for disassembly, comprehensive inspection, and renewal. We derive models and algorithms for this so-called turnaround scheduling that include different features such as time-cost trade-off, precedence constraints, external resource units, resource leveling, different working shifts, and risk analysis. We propose a framework for decision support that consists of two phases. The first phase supports the manager in finding a good makespan for the turnaround. It computes an approximate project time-cost trade-off curve together with a stochastic evaluation. Our risk measures are the expected tardiness at time t and the probability of completing the turnaround within time t. In the second phase, we solve the actual scheduling optimization problem for the makespan chosen in the first phase heuristically and compute a detailed schedule that respects all side constraints. Again, we complement this by computing upper bounds for the same two risk measures. Our experimental results show that our methods solve large real-world instances from chemical manufacturing plants quickly and yield an excellent resource utilization. A comparison with solutions of a mixed-integer program on smaller instances proves the high quality of the schedules that our algorithms produce within a few minutes.
引用
收藏
页码:189 / 204
页数:16
相关论文
共 50 条
  • [1] Optimization-based decision support system for ship scheduling
    Kim, Si-Hwa
    Lee, Kyung-Keun
    Computers and Industrial Engineering, 1997, 33 (3-4): : 689 - 692
  • [2] An optimization-based decision support system for ship scheduling
    Kim, SH
    Lee, KK
    COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (3-4) : 689 - 692
  • [3] SHUTDOWN SCHEDULING
    KURYTNIK, D
    PULP & PAPER-CANADA, 1981, 82 (11) : 151 - 152
  • [4] Hierarchical scheduling for decision support
    Gérard Fontan
    Colette Merce
    Jean-Claude Hennet
    Jean Lasserre
    Journal of Intelligent Manufacturing, 2005, 16 : 235 - 242
  • [5] Hierarchical scheduling for decision support
    Fontan, G
    Merce, C
    Hennet, JC
    Lasserre, J
    JOURNAL OF INTELLIGENT MANUFACTURING, 2005, 16 (02) : 235 - 242
  • [6] SCHEDULING SHUTDOWN MAINTENANCE ACTIVITIES USING MICROCOMPUTER OPTIMIZATION AND HEURISTICS
    FREESE, JA
    BUCK, JR
    MAINTENANCE MANAGEMENT INTERNATIONAL, 1988, 7 (02): : 115 - 120
  • [7] Optimization-based decision support system for crew scheduling in the cruise industry
    Giachetti, Ronald E.
    Damodaran, Purush
    Mestry, Sid
    Prada, Claudia
    COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 64 (01) : 500 - 510
  • [8] An Optimization Model and Decision Support System of Operating Room Scheduling in a Teaching Hospital
    Meliana, Innaka Rizki
    Purwoko, Pasca
    Aisyati, Azizah
    Priyandari, Yusuf
    Rosyidi, Cucuk Nur
    JOURNAL OF APPLIED SCIENCE AND ENGINEERING, 2022, 25 (05): : 731 - 739
  • [9] How to make shutdown, turnaround, and outage events successful
    Bullard, Dave
    Power, 2019, 163 (08):
  • [10] Decision rules for ambulance scheduling decision support systems
    Zhen, Lu
    Sheng, Shaopu
    Xie, Zhenhua
    Wang, Kai
    APPLIED SOFT COMPUTING, 2015, 26 : 350 - 356