The Oeresund bridge, erection of the superstructure

被引:0
|
作者
Sorensen, LT [1 ]
机构
[1] Sundlink Contractors HB, Malmo, Sweden
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
引用
收藏
页码:98 / 105
页数:2
相关论文
共 50 条
  • [1] The Oeresund Bridge, erection of the superstructure
    Sorensen, LT
    15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, PROCEEDINGS, 1998, : 98 - 105
  • [2] TORRIDGE BRIDGE - ERECTION OF SUPERSTRUCTURE
    POTHECARY, CH
    BRINDLE, L
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1990, 88 : 233 - 260
  • [3] Storebaelt East Bridge cable and superstructure erection - Advancing the state of the art
    Clenance, JC
    15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, 1998, : 122 - 129
  • [4] Storebaelt East Bridge cable and superstructure erection - Advancing the state of the art
    Clenance, JC
    15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, PROCEEDINGS, 1998, : 122 - 129
  • [5] ERECTION OF STEEL SUPERSTRUCTURE
    DURKEE, EL
    TRANSACTIONS OF THE AMERICAN SOCIETY OF CIVIL ENGINEERS, 1945, 110 : 82 - 119
  • [6] TORRIDGE BRIDGE - DESIGN - CONSTRUCTION OF SUBSTRUCTURE AND DECK PRECASTING WORK - ERECTION OF SUPERSTRUCTURE
    POTHECARY, CH
    CHRISTIE, TJC
    BRINDLE, L
    HAWKINS, MR
    ADLER, DJ
    WILSON, MC
    BOURNE, S
    GIBB, F
    DAWE, PH
    SIMPSON, AG
    CRADDY, MF
    CULLEY, DS
    BASA, A
    MOSS, AP
    OLEARY, E
    BRINDLE
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-STRUCTURES AND BUILDINGS, 1993, 99 (01) : 101 - 108
  • [7] ERECTION OF STEEL SUPERSTRUCTURE - DISCUSSION
    DIGENOVA, EO
    MACKINTOSH, C
    GOODRICH, CM
    THOMSON, TK
    SPOFFORD, CM
    MENSCH, LJ
    AMMANN, OH
    BALOG, L
    RAPP, WG
    BESKIN, L
    VANEENAM, N
    GRONQUIST, CH
    HIRSCHTHAL, M
    STERN, G
    HARDESTY, S
    GARRELTS, JM
    HEDRICK, IG
    TIMBY, EK
    MEAD, LM
    MCELDOWNEY, R
    COPP, JI
    DEVRIES, K
    JAMESON, WH
    JONES, J
    TRANSACTIONS OF THE AMERICAN SOCIETY OF CIVIL ENGINEERS, 1945, 110 : 120 - 178
  • [8] Newport Bridge superstructure
    HEDEFINE A
    SILANO LG
    1971, 97 (ST11): : 2653 - 78
  • [9] Superstructure Erection Techniques for T-Frame High-Speed Railway Bridge Without Independent Closure Section
    Du S.
    Weng F.-W.
    Zhou Y.
    Bridge Construction, 2023, 53 (01) : 143 - 149
  • [10] SEVERN BRIDGE - FABRICATION AND ERECTION
    HYATT, KE
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS, 1968, 41 (SEP): : 69 - &