Ex Post Risk Management in Public-Private Partnership Infrastructure Projects

被引:48
|
作者
Xiong, Wei [1 ]
Zhao, Xianbo [2 ]
Yuan, Jing-Feng [3 ]
Luo, Sai [4 ]
机构
[1] Tongji Univ, Dept Publ Adm, Shanghai, Peoples R China
[2] Cent Queensland Univ, Sch Engn & Technol, Rockhampton City, Qld, Australia
[3] Southeast Univ, Sch Civil Engn, Inst Construct Management & Real Estate, Dept Construct & Real Estate, Nanjing, Jiangsu, Peoples R China
[4] Hohai Univ, Sch Business Adm, Nanjing, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
public-private partnerships; risk management; renegotiation; early termination; INCOMPLETE CONTRACTS; FINANCIAL VIABILITY; POLITICAL RISKS; ALLOCATION; MODEL; SYSTEM;
D O I
10.1177/875697281704800305
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Public-private partnerships (PPPs) have been widely used in infrastructure development in the past 30 years. However, a number of PPP projects have suffered serious risk scenarios and ended up with project failures. The change from a short-term contract period of traditional projects (fewer than five years) to a long-term contract period of PPP projects (20-30 years) has raised challenges to the traditional risk management. The high occurrence of renegotiations and early terminations of PPP projects suggest that ex ante risk management is no longer enough and ex post risk management is needed. This study aims to propose an ex post risk management model, under which renegotiations and early terminations are introduced. The application of this model begins with risk impact evaluation, then ex post risk response measures assessment, selection, and enforcement. An illustrative case is provided in the Appendix at the end of the article. The outputs of this study would facilitate governments' decision making in PPP projects under serious risk scenarios.
引用
收藏
页码:76 / 89
页数:14
相关论文
共 50 条
  • [1] RISK MANAGEMENT AT REALIZATION OF INFRASTRUCTURE PROJECTS UNDER PUBLIC-PRIVATE PARTNERSHIP
    Hrytsenko, L. L.
    Krasulya, T. Y.
    ACTUAL PROBLEMS OF ECONOMICS, 2011, (126): : 85 - 90
  • [2] Operational Risk Management of Public-Private Partnership Infrastructure Projects: A Bibliometric Literature Review
    Jiang, Weiling
    Yang, Qianying
    Jiang, Jie
    Martek, Igor
    Gao, Fanjie
    BUILDINGS, 2022, 12 (11)
  • [3] Critical Process and Factors for Ex-Post Evaluation of Public-Private Partnership Infrastructure Projects in Indonesia
    Chou, Jui-Sheng
    Leatemia, Gabriele Theodora
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (05)
  • [4] Risk Allocation in Public-Private Partnership Infrastructure Projects: Comparative Study
    Ke, Yongjian
    Wang, ShouQing
    Chan, Albert P. C.
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2010, 16 (04) : 343 - 351
  • [5] Risk Management at Implementation of Social Projects of Public-Private Partnership
    Shubina, V., I
    Shemyatikhina, L. Y.
    Evseeva, M., V
    Shipitsyna, K. S.
    PROCEEDINGS OF THE INTERNATIONAL SCIENTIFIC CONFERENCE - FAR EAST CON (ISCFEC 2020), 2020, 128 : 2370 - 2376
  • [6] RISK-MANAGEMENT OF PUBLIC-PRIVATE PARTNERSHIP INNOVATION PROJECTS
    Hrytsenko, Larysa
    Boiarko, Iryna
    Tverezovska, Oleksandra
    Polcyn, Jan
    Miskiewicz, Radoslaw
    MARKETING AND MANAGEMENT OF INNOVATIONS, 2021, (02): : 155 - 165
  • [7] Collaborative Risk Management for Public-Private Partnership Projects in Australia
    Zhang, Guomin
    Jin, XiaoHua
    Huang, Chunyan
    PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 432 - 437
  • [8] RISK ASSESSMENT AND MANAGEMENT PUBLIC-PRIVATE PARTNERSHIP PROJECTS IN THE FISHERIES
    Mnatsakanyan, Albert G.
    Ogiy, Oksana G.
    MARINE INTELLECTUAL TECHNOLOGIES, 2018, 3 (04): : 134 - 141
  • [9] Identifying Measures of Effective Risk Management for Public-Private Partnership Infrastructure Projects in Developing Countries
    Mazher, Khwaja Mateen
    Chan, Albert P. C.
    Choudhry, Rafiq M.
    Zahoor, Hafiz
    Edwards, David J.
    Ghaithan, Ahmed M.
    Mohammed, Awsan
    Aziz, Mubashir
    SUSTAINABILITY, 2022, 14 (21)
  • [10] Risk Factors in IT Public-Private Partnership Projects
    Ghribi, Souhir
    Hudon, Pierre-Andre
    Mazouz, Bachir
    PUBLIC WORKS MANAGEMENT & POLICY, 2019, 24 (04) : 321 - 343