Post-conflict housing reconstruction in the Gaza Strip A case study of agency-driven housing in Sheikh Hamad city

被引:3
|
作者
Elkahlout, Ghassan [1 ]
机构
[1] Doha Inst Grad Studies, Doha, Qatar
关键词
Qatar; Housing affordability; Housing prices; Gaza strip; Agency-driven housing; Post-war reconstruction; RECOVERY;
D O I
10.1108/IJHMA-03-2019-0034
中图分类号
TU98 [区域规划、城乡规划];
学科分类号
0814 ; 082803 ; 0833 ;
摘要
Purpose The purpose of this paper is to study the feasibility of using the agency-driven housing approach in a post-conflict context. This paper aims to identify the challenges in applying the agency-driven approach within the context of post-conflict housing reconstruction in the Gaza Strip. Design/methodology/approach In this paper, a qualitative research approach was adopted. Semi-structured interviews were conducted with key stakeholders and representatives of project beneficiaries. Secondary data drawn from academic papers, articles, technical reports and media reports were also obtained. Findings The findings support doubts in the literature about the feasibility of using the agency-driven approach in post-conflict housing reconstruction. The paper concludes that an agency-driven housing project successfully constructed a few thousand housing units and provided thousands of temporary job opportunities. The project encountered challenges in beneficiary selection; affordability of housing units; access to building materials; governance issues; and delays in implementation. Practical implications - This paper offers valuable lessons for decision-makers, planners and architects to build on in future endeavours in Gaza and in similar contexts. Originality/value This paper particularly confirms the challenges of using the agency-driven housing approach in a post-conflict setting. These findings are useful for policy-makers to develop relevant strategies to address housing needs in the Gaza Strip.
引用
收藏
页码:317 / 330
页数:14
相关论文
共 24 条
  • [1] Managing post-conflict demolition wastes in Gaza Strip: a case study on May 2021 conflict
    AbuHamed, Hatem
    Al Bursh, Waheed
    Mfarreh, Suleiman Abu
    Yoshida, Mitsuo
    JOURNAL OF MATERIAL CYCLES AND WASTE MANAGEMENT, 2023, 25 (02) : 684 - 693
  • [2] Managing post-conflict demolition wastes in Gaza Strip: a case study on May 2021 conflict
    Hatem AbuHamed
    Waheed Al Bursh
    Suleiman Abu Mfarreh
    Mitsuo Yoshida
    Journal of Material Cycles and Waste Management, 2023, 25 : 684 - 693
  • [3] The reconstruction of housing in Palestine 1993-2000: A case study from the Gaza Strip
    Barakat, S
    Elkahlout, G
    Jacoby, T
    HOUSING STUDIES, 2004, 19 (02) : 175 - 192
  • [4] Factors influencing resource availability for post-disaster housing reconstruction: the case of Gaza Strip-Palestine
    Saleh, Nour
    Enshassi, Adnan
    Sundermeier, Matthias
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (12) : 1364 - 1374
  • [5] Life and Debt: Assessing the Impacts of Participatory Housing Reconstruction in Post-Conflict Sri Lanka
    Gunasekara, Vagisha
    Philips, Mira
    Romeshun, Kulsabanathan
    Munas, Mohammed
    STABILITY-INTERNATIONAL JOURNAL OF SECURITY AND DEVELOPMENT, 2016, 5 (01): : 1 - 17
  • [6] Post-Conflict Housing Restitution: The European Human Rights Perspective, With a Case Study on Bosnia and Herzegovina
    Leckie, Scott
    NETHERLANDS QUARTERLY OF HUMAN RIGHTS, 2010, 28 (01): : 137 - 140
  • [7] Towards improving the design and planning of post-conflict housing reconstruction projects: a conceptual framework
    Iskandarani, Heba
    Proverbs, David G.
    Xiao, Hong
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2023, 13 (02) : 253 - 269
  • [8] Post-Conflict Housing Restitution: The European Human Rights Perspective, with a Case Study on Bosnia and Herzegovina
    Gray, David
    INTERNATIONAL JOURNAL OF TRANSITIONAL JUSTICE, 2010, 4 (02) : 296 - 304
  • [9] Factors Influencing Post-disaster Reconstruction Project Management for Housing Provision in the Gaza Strip, Occupied Palestinian Territories
    Adnan Enshassi
    Tarik Chatat
    Jason von Meding
    Giuseppe Forino
    International Journal of Disaster Risk Science, 2017, 8 : 402 - 414
  • [10] Factors Influencing Post-disaster Reconstruction Project Management for Housing Provision in the Gaza Strip, Occupied Palestinian Territories
    Enshassi, Adnan
    Chatat, Tarik
    von Meding, Jason
    Forino, Giuseppe
    INTERNATIONAL JOURNAL OF DISASTER RISK SCIENCE, 2017, 8 (04) : 402 - 414