Bounce Forward: Economic Recovery in Post-Disaster Fukushima

被引:18
|
作者
Zhang, Hui [1 ,2 ]
Dolan, Chris [3 ]
Jing, Si Meng [1 ]
Uyimleshi, Justine [2 ]
Dodd, Peter [2 ]
机构
[1] Guangzhou Univ, Sch Publ Adm, Guangzhou 510006, Peoples R China
[2] UCL, Inst Risk & Disaster Reduct, London WC1E 6BT, England
[3] UCL, Inst Adv Studies, London WC1E 6BT, England
基金
英国经济与社会研究理事会;
关键词
adaptive capacity; economic resilience; nuclear pollution; COMMUNITY RESILIENCE; DISASTER; SUSTAINABILITY; ACCIDENT; RISKS; RECONSTRUCTION; EARTHQUAKE; CAPACITY; SCIENCE; MODEL;
D O I
10.3390/su11236736
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
After the cascading disaster-earthquake, tsunami, and nuclear accident-in Fukushima on 11 March 2011, the Fukushima region is facing a significant reconstruction challenge. Contamination, economic downturn, depopulation, labor shortage, a damaged reputation, and public distrust must be overcome in order to ensure the future economic recovery of Fukushima. Based on field surveys of the affected areas and unstructured interviews with key informants such as local residents, government officials, and local businesses, this study analyses economic recovery in Fukushima. By exploring four key "pillar" areas of Fukushima's economic recovery-renewable energy, manufacturing, agriculture, and tourism-this paper gives an overview of how to rebuild industry in the shadow of nuclear pollution. The results show how the economic recovery in Fukushima has required adaptation and innovation by the local people, and the economic downturn has been reversed and subsequently improved. Across the pillar industries, innovative reconstruction projects have been pioneered and led by local residents and businesses. Fukushima's industrial recovery has been facilitated by the efforts to make the livelihoods of local residents sustainable. It is argued that creative and sustainable economic recovery makes full use of people's and businesses' existing resources to transform the disadvantages caused by disasters into opportunities.
引用
收藏
页数:24
相关论文
共 50 条
  • [1] Post-Disaster Recovery and Economic Impact of Catastrophes in China
    Wu, Jidong
    Li, Ning
    Xie, Wei
    Zhou, Yang
    Ji, Zhonghui
    Shi, Peijun
    EARTHQUAKE SPECTRA, 2014, 30 (04) : 1825 - 1846
  • [2] Abandoned areas in post-disaster Fukushima, Japan
    Ozaki, A.
    Sawano, T.
    Tsukada, M.
    Ohira, H.
    Leppold, C.
    Tanimoto, T.
    QJM-AN INTERNATIONAL JOURNAL OF MEDICINE, 2016, 109 (05) : 353 - 354
  • [3] Becoming an Insider and an Outsider in Post-Disaster Fukushima
    Miyazawa, Kaoru
    HARVARD EDUCATIONAL REVIEW, 2018, 88 (03) : 334 - 354
  • [4] Post-Disaster Recovery Indicators and Recovery Patterns
    Wu, Jidong
    Li, Ning
    Ji, Zhonghui
    Gu, Xiaotian
    Fan, Bihang
    INNOVATIVE THEORIES AND METHODS FOR RISK ANALYSIS AND CRISIS RESPONSE, 2012, 21 : 177 - 182
  • [5] Chain tourism in post-disaster recovery
    Zavar, Elyse
    Lavy, Brendan L.
    Hagelman, Ronald R., III
    TOURIST STUDIES, 2020, 20 (04) : 429 - 449
  • [6] Post-disaster recovery: the challenge of anticipation
    Moatty, Annabelle
    Vinet, Freddy
    3RD EUROPEAN CONFERENCE ON FLOOD RISK MANAGEMENT (FLOODRISK 2016), 2016, 7
  • [7] Information Deficits and Post-Disaster Recovery
    Arneson, Erin
    Deniz, Derya
    Javernick-Will, Amy
    Liel, Abbie
    Dashti, Shideh
    CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 1546 - 1555
  • [8] Development-Aid Supply Chains for Economic Development and Post-Disaster Recovery
    Sodhi, ManMohan S.
    Knuckles, James
    PRODUCTION AND OPERATIONS MANAGEMENT, 2021, 30 (12) : 4412 - 4434
  • [9] Understanding post-disaster population recovery patterns
    Yabe T.
    Tsubouchi K.
    Fujiwara N.
    Sekimoto Y.
    Ukkusuri S.V.
    Journal of the Royal Society Interface, 2020, 17 (163)
  • [10] Embedded entrepreneurs and post-disaster community recovery
    Grube, Laura E.
    Storr, Virgil Henry
    ENTREPRENEURSHIP AND REGIONAL DEVELOPMENT, 2018, 30 (7-8): : 800 - 821