New mechanism of FA in composted sludge inducing Cu fixation on Albite in open-pit mine soil

被引:3
|
作者
Wan, Jiapeng [1 ]
Zeng, Yifan [1 ]
Wang, Mei [1 ]
Dong, Bin [1 ,2 ,3 ]
Xu, Zuxin [1 ]
机构
[1] Tongji Univ, Coll Environm Sci & Engn, State Key Lab Pollut Control & Resource Reuse, Shanghai 200092, Peoples R China
[2] China Three Gorges Corp, YANGTZE Ecoenvironm Engn Res Ctr, Beijing 100038, Peoples R China
[3] Shanghai Invest Design & Res Inst Co Ltd, Shanghai 200335, Peoples R China
来源
关键词
Fulvic acid; Composted sludge; Heavy metal; Open-pit mine; Mineralization; HUMIC SUBSTANCES; SPECIATION; BIOSORPTION; REMEDIATION; ACIDS; ZN;
D O I
10.1016/j.jes.2021.08.029
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Fulvic acid (FA), typical organic matter derived from humification process in composted sludge, possesses the potential to remediate mine soils contaminated by heavy metals. To understand the cooper (Cu) immobilizing process in open-pit mine soil induced by FA, changes of Cu speciation in mixture of open-pit mine soil and composted sludge was tracked over 180 days. It was observed that the organic-bound and residual fraction of Cu increased dramatically with the corresponding decrease of Fe/Mn oxide-bound Cu in the first 60 days, then the organic-bound fraction decreased to about its initial proportion during 60-120 days, while residual fraction still increased, and the proportion of residual Cu accounted for over 85% and became stable after 120 days. To reveal the mechanism of FA inducing Cu fixation on Albite which is the main phase of soil primary ore, two groups of Cu adsorption experiments with and without FA were designed. With the addition of FA, the adsorption capacity of Cu by Albite increased by 1.55 times and the content of residual Cu in Albite increased by 7.7 times. It was found that the Cu absorbed in smaller Albite particle induced by FA formed a secondary mineral--Chrysocolla, causing increase of residual fraction of Cu. These results revealed the mechanism: FA was absorbed on the surface of Albite after complexing with Cu ions in the solution, and then it induced Cu into the interlayer and pore channels of Albite. The Cu in the Albite was immobilized by forming Chrysocolla finally. (c) 2022 The Research Center for Eco-Environmental Sciences, Chinese Academy of Sciences. Published by Elsevier B.V.
引用
收藏
页码:142 / 150
页数:9
相关论文
共 50 条
  • [1] New mechanism of FA in composted sludge inducing Cu fixation on Albite in open-pit mine soil
    Jiapeng Wan
    Yifan Zeng
    Mei Wang
    Bin Dong
    Zuxin Xu
    Journal of Environmental Sciences, 2022, 116 (06) : 142 - 150
  • [2] Landslide mechanism and stability of an open-pit slope: The Manglai open-pit coal mine
    Chen, Tao
    Shu, Jisen
    Han, Liu
    Tovele, Gerson. S. V.
    Li, Baosheng
    FRONTIERS IN EARTH SCIENCE, 2023, 10
  • [3] Open-Pit Mine Backfilling with External Soil Material
    Waerder, Thomas
    Mining Report, 2021, 157 (05) : 450 - 454
  • [4] ON THE MECHANISM AND PROCESS OF SLOPE DEFORMATION IN AN OPEN-PIT MINE
    SIJING, W
    ROCK MECHANICS, 1981, 13 (03): : 145 - 156
  • [5] Monitoring soil restoration in an open-pit mine in northern Italy
    Menta, C.
    Conti, F. D.
    Pinto, S.
    Leoni, A.
    Lozano-Fondon, C.
    APPLIED SOIL ECOLOGY, 2014, 83 : 22 - 29
  • [6] Microstructure and adhesion force of dust on soil pavement in open-pit mine
    Wang, Jiuzhu
    Du, Cuifeng
    Wang, Yuan
    Chen, Zheng
    INTERNATIONAL JOURNAL OF COAL SCIENCE & TECHNOLOGY, 2023, 10 (01)
  • [7] Microstructure and adhesion force of dust on soil pavement in open-pit mine
    Jiuzhu Wang
    Cuifeng Du
    Yuan Wang
    Zheng Chen
    International Journal of Coal Science & Technology, 2023, 10
  • [8] Characteristics of soil erosion and its control in Antaibao open-pit mine
    Bai, Zhongke
    Wang, Zhiguo
    Zhao, Jingkui
    Tong, Zeang
    Chen, Jianjun
    Meitan Xuebao/Journal of China Coal Society, 1997, 22 (05): : 542 - 547
  • [9] A new methodology for the open-pit mine production scheduling problem
    Samavati, Mehran
    Essam, Daryl
    Nehring, Micah
    Sarker, Ruhul
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2018, 81 : 169 - 182
  • [10] A New Algorithm for the Open-Pit Mine Production Scheduling Problem
    Chicoisne, Renaud
    Espinoza, Daniel
    Goycoolea, Marcos
    Moreno, Eduardo
    Rubio, Enrique
    OPERATIONS RESEARCH, 2012, 60 (03) : 517 - 528