Performance of a bench-scale membrane pilot plant for the upgrading of biogas in a wastewater treatment plant

被引:49
|
作者
Stern, SA [1 ]
Krishnakumar, B
Charati, SG
Amato, WS
Friedman, AA
Fuess, DJ
机构
[1] Syracuse Univ, Dept Chem Engn & Mat Sci, Syracuse, NY 13244 USA
[2] Syracuse Univ, Dept Civil & Environm Engn, Syracuse, NY 13244 USA
[3] Niagara Mohawk Power Corp, Syracuse, NY 13202 USA
关键词
gas separations; biogas upgrading; biogas pilot plant;
D O I
10.1016/S0376-7388(98)00238-5
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
A bench-scale membrane pilot plant for upgrading biogas generated at a municipal wastewater treatment plant was constructed and operated for extended periods of time. The raw biogas was available at 45-60 psia (3.1-4.1 bar) and contained 62.6 mol% CH4, the balance being mainly CO2 and a large number of organic impurities. The operation of the pilot plant was tested with two identical hollow-fiber modules for periods of over 1000 h (41 days) with each module. One of the hollow-fiber modules was tested at an average pressure of about 525 psia (36 bar) and at stage-cuts of 0.34-0.41, and the other module at about 423 psia (29 bar) and at stage-cuts of 0.36-0.39. The flow rates of the biogas feed were 30-36 ft(3)/h (2.4x10(-4)-2.8 x 10(-4) m(3)/s) and 21-24 ft(3)/h (1.7 x 10(-4)-1.9 x 10(-4) m(3)/s), respectively. The CH4 concentration in the retentate stream (the upgraded biogas) was raised in these tests to 92-95 mol% CH4. The performance of the pilot plant was stable over the entire test periods. An even higher CH4 concentration of 97 mol% was reached in short-term tests at a stage-cut of 0.46. The raw biogas had to be pretreated to prevent the condensation of organic impurities which tended to dissolve the hollow fibers. Upgraded biogas containing over 90 mol% CH4 produced in a large-scale membrane separation plant could be used for the generation of electricity. At the same time, the permeate (waste) stream would contain over 15 mol% CH4 and could be used for heating applications. (C) 1998 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:63 / 74
页数:12
相关论文
共 50 条
  • [1] BENCH-SCALE SIMULATION OF FLOTATION PLANT PERFORMANCE
    AGAR, GE
    STRATTONCRAWLEY, R
    CIM BULLETIN, 1982, 75 (848): : 93 - 98
  • [3] Bench-Scale and Pilot Plant Nitration Experiments - Practical Considerations
    Hobenshield, Evan
    CHEMISTRY, PROCESS DESIGN, AND SAFETY FOR THE NITRATION INDUSTRY, 2013, 1155 : 107 - 120
  • [5] From bench-scale to pilot plant: Hindrances faced and resolutions for feasibility
    Hensley, Keith R.
    Gabel, Connie M.
    Cooper, Brian
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2014, 248
  • [6] Biogas upgrading via membrane process: Modelling of pilot plant scale and the end uses for the grid injection
    Molino, A.
    Migliori, M.
    Ding, Y.
    Bikson, B.
    Giordano, G.
    Braccio, G.
    FUEL, 2013, 107 : 585 - 592
  • [7] A new approach for upgrading biogas produced at a local wastewater treatment plant
    Boyaci, Yavuz Selim
    Uyanik, Sinan
    Yildiz, Hakan
    GLOBAL NEST JOURNAL, 2024, 26 (05):
  • [8] Uptake of NOx by activated carbons: Bench-scale and pilot-plant testing
    Neathery, JK
    Rubel, AM
    Stencel, JM
    CARBON, 1997, 35 (09) : 1321 - 1327
  • [9] BENCH-SCALE AND PILOT-PLANT PREPARATION OF CHEMICALLY MODIFIED POLYESTER RESINS
    DAIRANIEH, IS
    RASOUL, FA
    JOURNAL OF APPLIED POLYMER SCIENCE, 1991, 42 (06) : 1623 - 1629
  • [10] Treatment of low strength wastewater using bench-scale anaerobic membrane bioreactor
    Zeigler, Shelby
    Journal of New England Water Environment Association, 2007, 41 (01): : 25 - 27