Effects of initial surface treatment timing on chloride concentrations in concrete bridge decks

被引:4
|
作者
Birdsall, Aimee W. [1 ]
Guthrie, W. Spencer [1 ]
Bentz, Dale P. [2 ]
机构
[1] Brigham Young Univ, Dept Civil & Environm Engn, Provo, UT 84602 USA
[2] NIST, Bldg & Fire Res Lab, Inorgan Mat Grp, Mat & Construct Res Div, Gaithersburg, MD 20899 USA
关键词
D O I
10.3141/2028-12
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In consideration of concrete cover thickness and the presence of stay-in-place metal forms (SIPMFs), research was done to determine the latest timing of initial surface treatment applications on concrete bridge decks subjected to external chloride loading before chlorides accumulate in sufficient quantities to initiate corrosion of the reinforcing steel. Chloride concentration data for this research were collected from 12 concrete bridge decks located within the Interstate 215 corridor in Salt Lake City, Utah. Numerical modeling was used to generate a chloride loading function and to determine the diffusion coefficient of each deck.. On the basis of average diffusion coefficients for decks with and without SIPMFs, chloride concentration profiles were computed through time for cover thicknesses of 2.0 in. (50.8 mm), 2.5 in. (63.5 mm), and 3.0 in. (76.2 mm). The results of the work show that the average diffusion coefficient for bridge decks with SIPMFs is approximately twice that of decks without SIPMFs and that, on average, each additional 0.5 in. (12.7 mm) of cover beyond 2.0 in. allows an extra 2 years for decks with SIPMFs and 5 years for decks without SIPMFs before a surface treatment must be placed to prevent excessive accumulation of chlorides. Although the data generated in this research are based on conditions typical of bridge decks in Utah, they clearly illustrate the effect of cover depth and the presence of SIPMFs. This information may be especially valuable to bridge engineers and managers responsible for programming surface treatments on concrete bridge decks.
引用
收藏
页码:103 / 110
页数:8
相关论文
共 50 条
  • [1] Effect of Initial Timing of Scarification and Overlay Treatment on Chloride Concentrations in Concrete Bridge Decks
    Guthrie, W. Spencer
    Nolan, Curtis D.
    Bentz, Dale P.
    TRANSPORTATION RESEARCH RECORD, 2011, (2220) : 66 - 74
  • [2] SURFACE DEFECTS IN CONCRETE BRIDGE DECKS
    不详
    MATERIALS PROTECTION AND PERFORMANCE, 1973, 12 (11): : 53 - 53
  • [3] Effect of cracking on chloride content in concrete bridge decks
    Lindquist, Will D.
    Darwin, David
    Browning, JoAnn
    Miller, Gerald G.
    ACI MATERIALS JOURNAL, 2006, 103 (06) : 467 - 473
  • [4] SURFACE IMPREGNATION OF CONCRETE BRIDGE DECKS WITH POLYMERS
    PAUL, DR
    FOWLER, DW
    JOURNAL OF APPLIED POLYMER SCIENCE, 1975, 19 (01) : 281 - 301
  • [5] SURFACE IMPREGNATION OF NEW CONCRETE BRIDGE DECKS
    SMOAK, WG
    PUBLIC ROADS, 1976, 40 (01) : 1 - 5
  • [6] SURFACE IMPREGNATION OF CONCRETE BRIDGE DECKS WITH POLYMERS
    PAUL, DR
    FOWLER, DW
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 1973, (AUG26): : 91 - 91
  • [7] Chloride-induced corrosion of reinforced concrete bridge decks
    Kassir, MK
    Ghosn, M
    CEMENT AND CONCRETE RESEARCH, 2002, 32 (01) : 139 - 143
  • [8] Bond strength and chloride resistance of epoxy and concrete overlays on bridge decks
    Freeseman, Katelyn
    Wang, Kejin
    Tan, Yuxiang
    INTERNATIONAL JOURNAL OF PAVEMENT ENGINEERING, 2022, 23 (03) : 916 - 921
  • [9] Note on chloride-induced corrosion of reinforced concrete bridge decks
    Phurkhao, P
    Kassir, MK
    JOURNAL OF ENGINEERING MECHANICS-ASCE, 2005, 131 (01): : 97 - 99
  • [10] Statistical approach to ingress of chloride ions in silica fume concrete for bridge decks
    Detwiler, RJ
    Whiting, DA
    Lagergren, ES
    ACI MATERIALS JOURNAL, 1999, 96 (06) : 670 - 675