共 50 条
- [1] Technical operations and maintenance activities at the Paranal Observatory OBSERVATORY OPERATIONS: STRATEGIES, PROCESSES, AND SYSTEMS VII, 2018, 10704
- [2] Paranal instruments: installation, maintenance, optimization, and operation OBSERVATORY OPERATIONS: STRATEGIES, PROCESSES, AND SYSTEMS IV, 2012, 8448
- [3] Success of long term preventive maintenance on telescope subsystems using the example of the VLT Adapter-Rotators at the ESO Paranal Observatory OBSERVATORY OPERATIONS: STRATEGIES, PROCESSES, AND SYSTEMS IV, 2012, 8448
- [4] Maintenance Management at La Silla Paranal Observatory - art. no. 701606 OBSERVATORY OPERATIONS: STRATEGIES, PROCESSES, AND SYSTEMS II, 2008, 7016 : 1606 - 1606
- [5] Instrumentation activities at paranal observatory OBSERVATORY OPERATIONS TO OPTIMIZE SCIENTIFIC RETURN III, 2002, 4844 : 35 - 45
- [6] Surface Layer characterization at Paranal Observatory GROUND-BASED AND AIRBORNE TELESCOPES III, 2010, 7733
- [7] VLT(I) instrument operations and maintenance at the Paranal Observatory - art. no. 627009 Observatory Operations: Strategies, Processes, and Systems, 2006, 6270 : 27009 - 27009
- [8] OPTIMIZATION OF PREVENTIVE MAINTENANCE RUSSIAN ENGINEERING JOURNAL-USSR, 1971, 51 (02): : 20 - &
- [10] A Water Vapour Monitor at Paranal Observatory GROUND-BASED AND AIRBORNE INSTRUMENTATION FOR ASTRONOMY IV, 2012, 8446