Minimizing Fluctuation of the Maintenance, Repair, and Rehabilitation Cost Profile of a Building

被引:8
|
作者
Kim, Jonghyeob [1 ]
Han, Sangwon [1 ]
Hyun, Changtaek [1 ]
机构
[1] Univ Seoul, Dept Architectural Engn, Seoul 130743, South Korea
基金
新加坡国家研究基金会;
关键词
Maintenance; Cost profile; Resource leveling; Minimum moment method; BUDGET ALLOCATION; OPTIMIZATION;
D O I
10.1061/(ASCE)CF.1943-5509.0000775
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Preventive and regular maintenance, repair, and rehabilitation (MR&R) is necessary for a building to function satisfactorily throughout its lifecycle. A relatively constant MR&R budget is generally allocated to a building each year. However, because the components used in a building have different life expectancies, annual MR&R cost profiles may fluctuate quite strongly over time. Accordingly, if MR&R for several components comes due in the same budget period, the pre-allocated MR&R budget may not be sufficient to cover all necessary MR&R. In these cases, MR&R for some components would be postponed. This failure to conduct MR&R in a timely manner may adversely affect long-term performance of the building. To address this concern, this paper introduces a model that can minimize the fluctuation of the MR&R cost profile by adjusting the timing of some MR&R activities to earlier points than the initial MR&R schedule. Applying the newly developed model to a case study confirmed its applicability and effectiveness in stabilizing the MR&R cost profile. This paper makes a theoretical contribution to developing an optimization model that can minimize the fluctuation of the cost profile over time. It is of value to practitioners by providing an effective tool to establish a more reliable and executable MR&R schedule, thereby preventing MR&R activities from being postponed and increasing the life expectancy of a building. (C) 2015 American Society of Civil Engineers.
引用
收藏
页数:7
相关论文
共 50 条
  • [1] BMCloud: Minimizing Repair Bandwidth and Maintenance Cost in Cloud Storage
    Yin, Chao
    Xie, Changsheng
    Wan, Jiguang
    Hung, Chih-Cheng
    Liu, Jinjiang
    Lan, Yihua
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [2] Estimating agency cost of maintenance, repair, and rehabilitation for Florida bridges
    Sobanjo, J.O.
    Thompson, Paul D.
    Lewis, Mathew
    Kerr, Richard
    Transportation Research Record, 2002, (1795) : 66 - 73
  • [3] Estimating agency cost of maintenance, repair, and rehabilitation for Florida bridges
    Sobanjo, JO
    Thompson, PD
    Lewis, M
    Kerr, R
    MAINTENANCE OF PAVEMENTS AND STRUCTURES: MAINTENANCE, 2002, (1795): : 66 - 73
  • [4] A network flow model for clustering segments and minimizing total maintenance and rehabilitation cost
    Wang, I-Lin
    Tsai, Yi-Chang James
    Li, Feng
    COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 60 (04) : 593 - 601
  • [5] Minimizing the cost of maintenance dredging
    van Vechgel, R.H.W.
    Veltman, M.
    Dollee, A.W.
    de Haan, H.J.
    van Bochoven, G.
    Boodt, C.
    de Bruyne, J.M.
    de Haan, H.J.
    Hellema, J.A.
    Ottevanger, G.
    Rokosh, W.D.
    Van Rijt, C.
    van Vechgel, R.H.W.
    Vellinga, T.
    Veltman, M.
    Bulletin of the Permanent International Association of Navigation Congresses, 1988, (63): : 51 - 94
  • [6] Pipeline Rehabilitation: Minimizing Impacts and Reducing Maintenance
    Mikeworth, Douglas
    Davis, Kelly
    PIPELINES 2016 - OUT OF SIGHT, OUT OF MIND, NOT OUT OF RISK, 2016, : 1744 - 1755
  • [7] MINIMIZING THE COST OF MAINTENANCE IN A LARGE INTEGRATED STEELWORKS
    MACLEOD, RA
    FLEGG, PA
    PROUT, R
    TEROTECHNICA, 1981, 2 (02): : 89 - 103
  • [8] Minimizing the Communication Cost for Continuous Skyline Maintenance
    Zhang, Zhenjie
    Cheng, Reynold
    Papadias, Dimitris
    Tung, Anthony K. H.
    ACM SIGMOD/PODS 2009 CONFERENCE, 2009, : 495 - 507
  • [9] HOUSING-REHABILITATION - REPAIR AND MAINTENANCE
    不详
    ARCHITECTS JOURNAL, 1976, 163 (20): : 999 - 1003
  • [10] Building Optimization Model for Minimizing Operation and Maintenance Costs
    Ghafoori, Mahdi
    Abdallah, Moatassem
    CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 422 - 431