Balancing just-in-time production units:: The N U-line balancing problem

被引:0
|
作者
Sparling, D [1 ]
机构
[1] Univ Guelph, Dept Agr Econ & Business, OAC, Guelph, ON N1G 2W1, Canada
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
U-shaped production lines are a common component of Just-In-Time systems. When several U-lines operate in close proximity, an opportunity exists to balance two or more U-lines together and reduce the total number of stations required to operate the facility. The concept of a JIT production unit, where a number of U-lines produce and assemble parts for the same product line, is introduced. The problem of balancing a JIT Production Unit is considered as the N U-line balancing problem considering travel. This problem is modelled and heuristic solution algorithms are presented for both the general case, where U-line locations are not fixed, and for the fixed location case. A subproblem, the problem of assigning tasks to stations which may include tasks from more than one U-line, provides new challenges for operations managers. This new problem is the multi-line station assignment problem. The benefits of multiple U-line balancing are examined in an empirical study.
引用
收藏
页码:215 / 237
页数:23
相关论文
共 50 条