Robust Fuzzy-Stochastic Programming Model and Meta-Heuristic Algorithms for Dual-Resource Constrained Flexible Job-Shop Scheduling Problem Under Machine Breakdown

被引:11
|
作者
Soofi, Parham [1 ]
Yazdani, Mehdi [1 ]
Amiri, Maghsoud [2 ]
Adibi, Mohammad Amin [1 ]
机构
[1] Islamic Azad Univ, Qazvin Branch, Dept Ind Engn, Qazvin 3419915195, Iran
[2] Allameh Tabatabai Univ, Fac Management & Accounting, Dept Ind Management, Tehran 1434863111, Iran
来源
IEEE ACCESS | 2021年 / 9卷
关键词
Electric breakdown; Job shop scheduling; Uncertainty; Genetic algorithms; Programming; Stochastic processes; Schedules; Dual-resource constrained; flexible job-shop scheduling; genetic algorithm; machine breakdown; robust fuzzy-stochastic programming; uncertainty; vibration damping optimization; DAMPING OPTIMIZATION ALGORITHM; NEIGHBORHOOD SEARCH; GENETIC ALGORITHM; SUSTAINABILITY; RESILIENCE; SOLVE;
D O I
10.1109/ACCESS.2021.3126820
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Resource scheduling, job sequencing, and assigning them to available resources are the most critical issues in manufacturing systems, such as flexible job-shop systems. In addition, scheduling uncertainties have attracted significant attention in this field. This study investigates the dual-resource constrained flexible job-shop scheduling (DRCFJSS) problem under machine breakdown and operational uncertainty. Stochastic scenario-based methods were utilized to study the uncertain nature of the problem. Because process times have inherent uncertainty, they are considered fuzzy numbers and are controlled by a credibility-based measure. Robust scheduling must be developed to address unexpected disruptions, such as machine breakdowns and operational risks, such as uncertain process times. Accordingly, a novel robust fuzzy stochastic programming (RFSP) model is presented for this problem. In the proposed RFSP model, the objective function is formulated using a hybrid measure (i.e., a combined average-case and worst-case performance of the manufacturing system) under probable machine breakdown scenarios. Because the DRCFJSS problem is NP-hard, two types of meta-heuristic algorithms, evolutionary population-based, genetic algorithm (GA), and vibration damping optimization (VDO) algorithm, are used for large-sized problems. Then, the proposed RFSP model was applied to a case study, and numerical experiments with randomly generated test problems were used. In small-sized problems, the proposed model is solved using the CPLEX solver, GA and VDO algorithms. Also, the computational study confirms the proper quality of the results of the GA and VDO algorithms in medium and large-sized problems.
引用
收藏
页码:155740 / 155762
页数:23
相关论文
共 24 条
  • [1] Two meta-heuristic algorithms for the dual-resource constrained flexible job-shop scheduling problem
    Yazdani, M.
    Zandieh, M.
    Tavakkoli-Moghaddam, R.
    Jolai, F.
    SCIENTIA IRANICA, 2015, 22 (03) : 1242 - 1257
  • [2] Evolutionary algorithms for multi-objective dual-resource constrained flexible job-shop scheduling problem
    Yazdani, M.
    Zandieh, M.
    Tavakkoli-Moghaddam, R.
    OPSEARCH, 2019, 56 (03) : 983 - 1006
  • [3] Evolutionary algorithms for multi-objective dual-resource constrained flexible job-shop scheduling problem
    M. Yazdani
    M. Zandieh
    R. Tavakkoli-Moghaddam
    OPSEARCH, 2019, 56 : 983 - 1006
  • [4] META-HEURISTIC APPROACH BASED ON GENETIC AND GREEDY ALGORITHMS TO SOLVE FLEXIBLE JOB-SHOP SCHEDULING PROBLEM
    Rezaeipanah, Amin
    Sarhangnia, Fariba
    Abdollahi, Mohammad Javad
    COMPUTER SCIENCE-AGH, 2021, 22 (04): : 463 - 488
  • [5] Solving a new robust reverse job shop scheduling problem by meta-heuristic algorithms
    Dehghan-Sanej, K.
    Eghbali-Zarch, M.
    Tavakkoli-Moghaddam, R.
    Sajadi, S. M.
    Sadjadi, S. J.
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2021, 101
  • [6] Domain Knowledge Used in Meta-Heuristic Algorithms for the Job-Shop Scheduling Problem: Review and Analysis
    Gui, Lin
    Li, Xinyu
    Zhang, Qingfu
    Gao, Liang
    TSINGHUA SCIENCE AND TECHNOLOGY, 2024, 29 (05): : 1368 - 1389
  • [7] A two-stage assignment strategy for the robust scheduling of dual-resource constrained stochastic job shop scheduling problems
    Xiao, Shichang
    Wu, Zigao
    Yu, Shaohua
    IFAC PAPERSONLINE, 2019, 52 (13): : 421 - 426
  • [8] Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints
    Dalfard, Vahid Majazi
    Mohammadi, Ghorbanali
    COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2012, 64 (06) : 2111 - 2117
  • [9] A multi-objective mathematical model and evolutionary algorithm for the dual-resource flexible job-shop scheduling problem with sequencing flexibility
    Alejandro Vital-Soto
    Mohammed Fazle Baki
    Ahmed Azab
    Flexible Services and Manufacturing Journal, 2023, 35 : 626 - 668
  • [10] A multi-objective mathematical model and evolutionary algorithm for the dual-resource flexible job-shop scheduling problem with sequencing flexibility
    Vital-Soto, Alejandro
    Baki, Mohammed Fazle
    Azab, Ahmed
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2023, 35 (03) : 626 - 668