An Experimental Comparison of Production Planning Using Clearing Functions and Iterative Linear Programming-Simulation Algorithms

被引:58
|
作者
Kacar, Necip Baris [1 ,2 ]
Irdem, Durmus Fatih [3 ]
Uzsoy, Reha [1 ]
机构
[1] N Carolina State Univ, Edward P Fitts Dept Ind & Syst Engn, Raleigh, NC 27695 USA
[2] SAS Inst, Cary, NC 27513 USA
[3] Schneider Elect, Lexington, KY 40511 USA
基金
美国国家科学基金会;
关键词
Clearing function; linear programming (LP); production planning; simulation; workload-dependent lead times; LEAD TIMES; MODELS;
D O I
10.1109/TSM.2011.2176560
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We compare the performance of three algorithms for production planning with workload-dependent lead times. These include a clearing function model using two different methods for estimating the clearing functions, and two iterative algorithms that combine linear programming and simulation models. Our experimental comparison uses a simulation model of a re-entrant bottleneck system built with attributes of a real-world semiconductor fabrication environment. We vary the bottleneck utilization, demand patterns, the mean time to failure, and the mean time to repair. Results indicate that the clearing function model performs better than the iterative algorithms on the scaled-down system considered, giving less variable production plans and higher profit values.