Mechanism Analysis of Roof Deformation in Pre-Driven Longwall Recovery Rooms Considering Main Roof Failure Form

被引:5
|
作者
Wang, Bonan [1 ]
Mu, Lin [1 ]
He, Mingming [1 ]
Gu, Shuancheng [2 ]
机构
[1] Xian Univ Technol, Sch Civil Engn & Architecture, Xian 710048, Peoples R China
[2] Xian Univ Sci & Technol, Sch Architecture & Civil Engn, Xian 710054, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
pre-driven recovery room; roof sag; coal pillar stress; periodic weighting; SUPPORT;
D O I
10.3390/su14159093
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Pre-driven recovery rooms are used extensively for the removal of mining equipment and hydraulic supports in longwall coal mining. Roof stability is a crucial factor influencing the speed and safety of the removal of operators in pre-driven recovery rooms. The characterization of roof deformation mechanisms in recovery rooms under front abutment pressures is significant for surrounding rock control and stability evaluation. In this study, three different roof subsidence evaluation models, considering different main roof failure forms, were established. It was noticed that the main roof break position had a significant effect on recovery room roof sag. The breaking of the main roof above the main recovery room and protective coal pillar was found to be the main driving force for large roof deformations. Furthermore, field monitoring data of roof sag and coal pillar stress in the 15205 and 15206 panels of Hongliulin Coal Mine were analyzed. According to evaluation models and field monitoring data, we propose determination methods for the evaluation of recovery room roof sag and main roof break position. During the study it was found that the inversion results of the main roof break position of the recovery room in 15205 and 15206 panels were 4.2 m and 9.1 m, respectively, which are basically consistent with the results calculated by periodic weighting. The research findings provide a reference for the quantitative evaluation of recovery room roof stability and the design of support parameters and yield mining.
引用
收藏
页数:20
相关论文
共 16 条
  • [1] Method for determining the width of protective coal pillar in the pre-driven longwall recovery room considering main roof failure form
    Wang, Bonan
    Dang, Faning
    Gu, Shuancheng
    Huang, Rongbin
    Miao, Yanping
    Chao, Wei
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2020, 130
  • [2] Prediction of Roof Failure in Pre-driven Entries and Selecting a Suitable Type of Recovery Room Method in Longwall Mining
    Aghababaei, Sajjad
    Jalalifar, Hossein
    Hosseini, Ali
    Chinaei, Farhad
    Najafi, Mehdi
    JOURNAL OF MINING AND ENVIRONMENT, 2024, 15 (01): : 223 - 237
  • [3] The Roof Support Load Analysis for Pre-Driven Recovery Room Parameters Design
    Zorkov, Danil
    Renev, Alexey
    Filimonov, Konstantin
    Zainulin, Rinat
    VTH INTERNATIONAL INNOVATIVE MINING SYMPOSIUM, 2020, 174
  • [4] Surrounding rock deformation and stress evolution in pre-driven longwall recovery rooms at the end of mining stage
    Wang, Bonan
    Dang, Faning
    Chao, Wei
    Miao, Yanping
    Li, Jun
    Chen, Fei
    INTERNATIONAL JOURNAL OF COAL SCIENCE & TECHNOLOGY, 2019, 6 (04) : 536 - 546
  • [5] Surrounding rock deformation and stress evolution in pre-driven longwall recovery rooms at the end of mining stage
    Bonan Wang
    Faning Dang
    Wei Chao
    Yanping Miao
    Jun Li
    Fei Chen
    International Journal of Coal Science & Technology, 2019, 6 : 536 - 546
  • [7] Field and Numerical Investigations on Pumpable Standing Supports Failure Analysis in the Longwall Pre-driven Recovery Room
    Zhang, Dong
    Bai, Jianbiao
    Zhang, Zizheng
    Zhu, Qiancheng
    Deng, Min
    Yan, Shuai
    Wang, Rui
    Liu, Shuaigang
    ROCK MECHANICS AND ROCK ENGINEERING, 2025, 58 (01) : 1199 - 1220
  • [8] Mechanism and control of roof fall and support failure incidents occurring near longwall recovery roadways
    Zhu, W.
    Xu, J.
    Xu, G.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2017, 117 (11) : 1063 - 1072
  • [9] Weighting Failure Mechanisms of Pre-Driven Recovery Rooms and Evaluation of Hydraulic Fracturing Applications: A Case Study
    Li, Guanjun
    Wang, Xiangyu
    Bai, Jianbiao
    Zhang, Yongqiang
    Zhang, Feiteng
    Li, Menglong
    APPLIED SCIENCES-BASEL, 2023, 13 (08):
  • [10] Study on deformation mechanism and roof pre-splitting control technology of gob-side entry in thick hard main roof full-mechanized longwall caving panel
    Wang, Hao-sen
    He, Man-chao
    Wang, Jiong
    Yang, Gang
    Ma, Zi-min
    Ming, Can
    Wang, Rui
    Feng, Zeng-chao
    Zhang, Wen-jie
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2024, 31 (09) : 3206 - 3224