Renovation of the suspended roof of the Olympic Swimming Pool in Munich

被引:2
|
作者
Goeppert, Knut [1 ]
Linden, Sebastian [2 ]
机构
[1] Geschaftsfuhrer, Munich, Germany
[2] Mitarbeiter Schlaich Bergermann & Partner, D-70178 Stuttgart, Germany
关键词
D O I
10.1002/stab.200710092
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Olympic Swimming Pool being part of the Munich Olympic Facilities was built for the 1972 Olympic Summer Games. After more than 30 years the structural integrity and the thermal behaviour of the suspended membrane ceiling reached a critical stage. The following article describes the history of the suspended roof It covers architectural structural and thermal demands in its original state as well as the redesign and execution of the new, recently finished membrane ceiling.
引用
收藏
页码:880 / 886
页数:7
相关论文
共 50 条
  • [1] RENOVATION IN SWIMMING POOL CONTROL
    Stovall, W. D.
    Nichols, M. Starr
    Vincent, Vera E.
    AMERICAN JOURNAL OF PUBLIC HEALTH, 1926, 16 (03) : 237 - 243
  • [2] STEEL ROOF OF MUNICH OLYMPIC STADIUM
    LANTWIN, S
    TECHNISCHE MITTEILUNGEN KRUPP WERKSBERICHTE, 1972, 30 (01): : 45 - &
  • [3] UNIQUE ROOF FOR MUNICH OLYMPIC STADIUM
    MEMMEL, M
    BALL BEARING JOURNAL, 1972, (172): : 11 - &
  • [4] KIRCHBERG OLYMPIC SWIMMING POOL, LUXEMBOURG
    TAILLIBERT, R
    ARCHITECTURE D AUJOURD HUI, 1982, 224 (DEC): : R13 - R14
  • [5] FLOODLIGHT FOR OLYMPIC SWIMMING-POOL
    不详
    LICHTTECHNIK, 1972, 24 (08): : 402 - &
  • [6] CABLE-SUSPENDED ROOF FOR MUNICH OLYMPICS
    LEONHARD.F
    SCHLAICH, J
    CIVIL ENGINEERING, 1972, 42 (07): : 41 - &
  • [7] CONSTRUCTION OF AN OLYMPIC SIZE SWIMMING POOL.
    Gupta, B.M.
    Journal of the Institution of Engineers (India): Civil Engineering Division, 1986, 67 (01): : 1 - 4
  • [8] Simulation of the flow field of water in an Olympic swimming pool
    Lopez, R.
    Vaca, M.
    Terres, H.
    Lizardi, A.
    Chavez, S.
    Meza, E.
    VIII INTERNATIONAL CONGRESS OF ENGINEERING PHYSICS, 2017, 792
  • [9] Support and Ahchorage of the Olympic Tent Roof in Munich, West Germany.
    Haubitz, G.
    1600, (14):
  • [10] A timber roof for a new swimming pool at Alfriston School, Buckinghamshire
    Downey, Andy
    Renshaw, Mark
    Structural Engineer, 2015, 93 (12): : 18 - 24