Launch and early operation of the MESSENGER mission

被引:0
|
作者
Holdridge, Mark E. [1 ]
Calloway, Andrew B. [1 ]
机构
[1] Johns Hopkins Univ, Appl Phys Lab, Laurel, MD 20723 USA
基金
美国国家航空航天局;
关键词
Mercury; MESSENGER; mission operations;
D O I
10.1007/s11214-007-9261-8
中图分类号
P1 [天文学];
学科分类号
0704 ;
摘要
On August 3, 2004, at 2:15 a.m. EST, the MESSENGER mission to Mercury began with liftoff of the Delta II 7925H launch vehicle and 1,107-kg spacecraft including seven instruments. MESSENGER is the seventh in the series of NASA Discovery missions, the third to be built and operated by The Johns Hopkins University Applied Physics Laboratory (JHU/APL) following the Near Earth Asteroid Rendezvous (NEAR) Shoemaker and Comet Nucleus Tour (CONTOUR) missions. The MESSENGER team at JHU/APL is using efficient operations approaches developed in support of the low-cost NEAR and CONTOUR operations while incorporating improved approaches for reducing total mission risk. This paper provides an overview of the designs and operational practices implemented to conduct the MESSENGER mission safely and effectively. These practices include proven approaches used on past JHU/APL operations and new improvements implemented to reduce risk, including adherence to time-proven standards of conduct in the planning and implementation of the mission. This paper also discusses the unique challenges of operating in orbit around Mercury, the closest planet to the Sun, and what specific measures are being taken to address those challenges.
引用
收藏
页码:573 / 600
页数:28
相关论文
共 50 条
  • [1] Launch and Early Operation of the MESSENGER Mission
    Mark E. Holdridge
    Andrew B. Calloway
    Space Science Reviews, 2007, 131 : 573 - 600
  • [2] The MESSENGER mission to Mercury: Development history and early mission status
    McNutt, Ralph L., Jr.
    Solomon, Sean C.
    Gold, Robert E.
    Leary, James C.
    MERCURY, MARS AND SATURN, 2006, 38 (04): : 564 - 571
  • [3] The MESSENGER mission to Mercury: Development history and early mission status
    McNutt, Ralph L., Jr.
    Solomon, Sean C.
    Gold, Robert E.
    Leary, James C.
    ADVANCES IN SPACE RESEARCH, 2006, 38 (04) : 564 - 571
  • [4] The Juno Mission to Jupiter Launch Campaign and Early Cruise Report
    Nybakken, Rick
    2012 IEEE AEROSPACE CONFERENCE, 2012,
  • [5] SHUTTLE MISSION-8, SET FOR NIGHT LAUNCH, WILL VERIFY TDRS OPERATION
    COVAULT, C
    AVIATION WEEK & SPACE TECHNOLOGY, 1983, 119 (08): : 150 - &
  • [6] Gravity mission to launch
    Schiermeier, Quirin
    NATURE, 2009, 458 (7235) : 133 - 133
  • [7] Gravity mission to launch
    Quirin Schiermeier
    Nature, 2009, 458 : 133 - 133
  • [8] APPLICATION OF EXISTING LAUNCH AND FLIGHT SYSTEM HARDWARE FOR EARLY SEI MISSION
    SIEGFRIED, WH
    GARVEY, JM
    ACTA ASTRONAUTICA, 1994, 32 (12) : 821 - 827
  • [9] ALOS-2 LAUNCH AND EARLY ORBIT OPERATION RESULT
    Arikawa, Yoshihisa
    Saruwatari, Hideki
    Hatooka, Yasushi
    Suzuki, Shinichi
    2014 IEEE INTERNATIONAL GEOSCIENCE AND REMOTE SENSING SYMPOSIUM (IGARSS), 2014,
  • [10] Early navigation results for NASA'S MESSENGER mission to Mercury
    Williams, B
    Taylor, A
    Carranza, E
    Miller, J
    Stanbridge, D
    Page, B
    Cotter, D
    Efron, L
    Farquhar, R
    McAdams, J
    Dunham, D
    Spaceflight Mechanics 2005, Vol 120, Pts 1 and 2, 2005, 120 : 1233 - 1250