A technical note on using work sampling to estimate the effort on activities under activity-based costing

被引:23
|
作者
Tsai, WH
机构
[1] Dept. of Business Administration, National Central University, Chung-Li
关键词
activity-based costing (ABC); work sampling; first-stage cost assignment; effort (labor) costs;
D O I
10.1016/0925-5273(95)00189-1
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Activity-based costing (ABC) assumes that activities consume resources and products consume activities. It uses the two-stage procedure to calculate the product costs: it traces the resource costs to the activities, and then traces the costs of activities to the products. In the current practice for first-stage cost assignment, effort (labor) costs are traced to the activities by the estimates of effort expended on activities, and these estimates are often derived from information gathered from interviews, questionnaires, and time cards. However, it is not objective to achieve these estimates from interviews or questionnaires. It is too time-consuming to use time cards to acquire these estimates in some situations although it is the most accurate method. The purpose of this paper is to explain how to use work sampling to estimate objectively the effort spent on activities under activity-based costing. The results of work sampling study also indicate percentages of nonvalue-added activities, which provide the best opportunities for continuous improvement.
引用
收藏
页码:11 / 16
页数:6
相关论文
共 50 条
  • [1] An activity-based costing estimate of anemia correction activities in an oncology practice.
    Meehan, KR
    Tchekmedyian, S
    Smith, RE
    Kleinman, L
    Fitzmaurice, T
    Kallich, JD
    BLOOD, 2002, 100 (11) : 502B - 502B
  • [2] The Determination of Cost Drivers under Activity-Based Costing
    Sheng, Yanmei
    NINTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I-III, 2010, : 1680 - 1682
  • [3] Activity-based costing user satisfaction and type of system: A research note
    Pike, Richard H.
    Tayles, Mike E.
    Abu Mansor, Nur Naha
    BRITISH ACCOUNTING REVIEW, 2011, 43 (01): : 65 - 72
  • [4] Optimization of crew configurations using activity-based costing
    Maxwell, DA
    Back, WE
    Toon, J
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (02): : 162 - 168
  • [5] Using relative profits as an alternative to activity-based costing
    Homburg, C
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 95 (03) : 387 - 397
  • [6] Maintenance cost estimation: application of activity-based costing as a fair estimate method
    Haroun, Ahmed E.
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2015, 21 (03) : 258 - 270
  • [7] Activity-Based Costing: A More Accurate Way to Estimate the Costs for a Restaurant Menu
    Raab, Carola
    Shoemaker, Stowe
    Mayer, Karl J.
    INTERNATIONAL JOURNAL OF HOSPITALITY AND TOURISM ADMINISTRATION, 2007, 8 (03): : 1 - 15
  • [8] Applied Research of Activity-Based Costing Under ERP Environment
    Cao, Xihui
    Yu, Zhenwei
    2016 13TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, 2016,
  • [9] Using time-driven activity-based costing to improve the managerial activities of academic libraries
    Kissa, Barbara
    Stavropoulos, Antonios
    Karagiorgou, Dimitra
    Tsanaktsidou, Elisavet
    JOURNAL OF ACADEMIC LIBRARIANSHIP, 2019, 45 (05):
  • [10] Time-driven activity-based costing: a driver for provider engagement in costing activities and redesign initiatives
    McLaughlin, Nancy
    Burke, Michael A.
    Setlur, Nisheeta P.
    Niedzwiecki, Douglas R.
    Kaplan, Alan L.
    Saigal, Christopher
    Mahajan, Aman
    Martin, Neil A.
    Kaplan, Robert S.
    NEUROSURGICAL FOCUS, 2014, 37 (05)