The effect of contract methods on the lead time of a two-level photovoltaic supply chain: revenue-sharing vs. cost-sharing

被引:19
|
作者
Zhao, Jing [1 ,2 ]
Zhang, Qin [1 ,2 ]
机构
[1] Nanjing Univ Aeronaut & Astronaut, Coll Econ & Management, Nanjing 210016, Peoples R China
[2] Nanjing Univ Aeronaut & Astronaut, Res Ctr Soft Energy Sci, Nanjing 210016, Peoples R China
基金
中国国家自然科学基金;
关键词
Photovoltaic industry; Lead time; Supply chain; Revenue-sharing; Cost-sharing; DELIVERY TIME; COORDINATION CONTRACTS; DECISIONS; CAPACITY; PRICE; POWER; QUOTATION; IMPACT; MANAGEMENT; REDUCTION;
D O I
10.1016/j.energy.2021.120930
中图分类号
O414.1 [热力学];
学科分类号
摘要
In the photovoltaic industry, a large number of photovoltaic power plants are not delivered according to construction schedules, resulting in considerable impacts on various stakeholders. Lead time has been identified as one of the key issues that urgently needs to be resolved. In this paper, we study a two-level photovoltaic supply chain consisting of the customer, the assembler, and the module manufacturer. The basic model, revenue-sharing model, and cost-sharing model are established to analyze the lead time of the module manufacturer and the assembler considering the decline of government subsidies. The results indicate that the cost-sharing contract can effectively control the lead time of the module manufacturer, but the revenue-sharing contract cannot exert this control. Furthermore, if the government subsidy drops from 0.0553 USD/kWh to 0.01195 USD/kWh, the production capacity will be reduced by approximately 37% due to the reduction in installed capacity, and the lead time will decrease by about 27%. For the module manufacturer, when the non-production capacity costs drop by 20%, the profit increases by about 58%. However, when the production capacity costs are reduced by 20%, the profit increases by only about 6%. (c) 2021 Elsevier Ltd. All rights reserved.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] Sharing Logistics Service Supply Chain with Revenue-Sharing vs. Cost-Sharing Contracts
    Luo, Ying
    Wei, Qiang
    Gou, Xinyu
    Dai, Dai
    Zhou, Yiran
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [2] Research on the coordination of a marine green fuel supply chain considering a cost-sharing contract and a revenue-sharing contract
    Xu, Chang-yan
    Wang, Yi-qun
    Yao, Di-lin
    Qiu, Si-yuan
    Li, Hui
    FRONTIERS IN MARINE SCIENCE, 2025, 12
  • [3] Research on the Supply Chain Revenue-sharing Contract under Different Revenue-sharing Ratios
    Sui, Ru-bin
    An, Guo-fu
    Zhang, Song-tao
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 90 - +
  • [4] Coordinating Two-Level Supply Chain with Risk-averse Preferences Based on Revenue-sharing Contract
    Pang Qinghua
    PROCEEDINGS OF THE 27TH CHINESE CONTROL CONFERENCE, VOL 6, 2008, : 774 - 779
  • [5] Revenue-sharing vs. cost-sharing contracts in motivating supplier corporate social responsibility
    Li, Furong
    Lv, Fei
    ASIA PACIFIC JOURNAL OF MARKETING AND LOGISTICS, 2024, 36 (11) : 2785 - 2812
  • [6] Revenue-sharing Contract of Supply Chain with Sale Effort Cost Partaking
    Liu, Zhiyong
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON LOGISTICS, ENGINEERING, MANAGEMENT AND COMPUTER SCIENCE (LEMCS 2015), 2015, 117 : 1203 - 1206
  • [7] Analysis of a revenue-sharing contract in supply chain management
    Qin, Z.
    Yang, J.
    INTERNATIONAL JOURNAL OF LOGISTICS-RESEARCH AND APPLICATIONS, 2008, 11 (01) : 17 - 29
  • [8] Towards integration: a revenue-sharing contract in a supply chain
    Qin, Zhaoqiong
    IMA JOURNAL OF MANAGEMENT MATHEMATICS, 2008, 19 (01) : 3 - 15
  • [9] Revenue-Sharing Contract of Three-Level Supply Chain Under Disruption
    Pang, QingHua
    Jiang, Hui
    Lu, TianTian
    DIGITAL MANUFACTURING & AUTOMATION III, PTS 1 AND 2, 2012, 190-191 : 160 - +
  • [10] The Study of Supply Chain with a Revenue-sharing Contract under RFID
    Lei Quan-sheng
    Zeng Li-li
    2013 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING (ICMSE), 2013, : 592 - 597