共 17 条
- [1] Online Monitoring of Power Extraction Efficiency for Minimizing Payback Period of Solar PV System 2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY (ICIT), 2015, : 2863 - 2868
- [6] Investment Grants by the German Regional Policy: How did the Subsidized Plants Perform? RAUMFORSCHUNG UND RAUMORDNUNG-SPATIAL RESEARCH AND PLANNING, 2012, 70 (01): : 31 - 48
- [9] Determination of the areas for The Investment of Solar Power Plants (SPP) In Burdur via GIS Based AHP Method GEOMATIK, 2020, 5 (01): : 36 - 46