Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance

被引:35
|
作者
Gutierrez, G [1 ]
Paul, A
机构
[1] Univ Texas, Austin, TX 78712 USA
[2] Univ Florida, Gainesville, FL 32611 USA
关键词
D O I
10.1287/opre.48.6.927.12398
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The problem of designing a contract mechanism to allocate the component subprojects of a large project to a pool of contractors has important implications for project success. Our research analytically addresses issues involved in diversifying risk for the project owner by partitioning the project and assigning the subprojects to multiple contractors whose performance characteristics are imperfectly known. We begin by giving a precise analytical treatment of the effect of activity variance on expected project duration, characterizing the cases when an increase in activity variance pushes up the expected project duration. In the case of a homogeneous project consisting of serial subprojects, we show that disaggregating the project and assigning the subprojects to the contractors on a piecemeal basis reduces Variance of project duration while leaving the mean unchanged. On the other hand, in the case of a homogeneous project consisting of parallel subprojects, aggregating the subprojects and assigning the aggregated project to one of the contractors reduces mean project duration.
引用
收藏
页码:927 / 938
页数:12
相关论文
共 50 条
  • [1] Risk-pooling over demand uncertainty in the presence of product modularity
    Weng, ZK
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1999, 62 (1-2) : 75 - 85
  • [2] Risk-pooling over demand uncertainty in the presence of product modularity
    Kevin Weng, Z.
    International Journal of Production Economics, 1999, 62 (01): : 75 - 85
  • [3] COMPONENT PROCUREMENT AND ALLOCATION FOR PRODUCTS ASSEMBLED TO FORECAST - RISK-POOLING EFFECTS
    GROTZINGER, SJ
    SRINIVASAN, R
    AKELLA, R
    BOLLAPRAGADA, S
    IBM JOURNAL OF RESEARCH AND DEVELOPMENT, 1993, 37 (04) : 523 - 536
  • [4] The effects of project uncertainty and risk management on IS development project performance: A vendor perspective
    Liu Jun
    Wang Qiuzhen
    Ma Qingguo
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (07) : 923 - 933
  • [5] Health insurance in South Africa:: an empirical analysis of trends in risk-pooling and efficiency following deregulation
    Söderlund, N
    Hansl, B
    HEALTH POLICY AND PLANNING, 2000, 15 (04) : 378 - 385
  • [6] THE EFFECT OF COORDINATION AND UNCERTAINTY ON SOFTWARE PROJECT PERFORMANCE - RESIDUAL PERFORMANCE RISK AS AN INTERVENING VARIABLE
    NIDUMOLU, S
    INFORMATION SYSTEMS RESEARCH, 1995, 6 (03) : 191 - 219
  • [7] Adult height and risk of gastric cancer: a pooled analysis within the stomach cancer pooling project
    Giraldi, L.
    Stojanovic, J.
    Arzani, D.
    Persiani, R.
    Harbin, J. Hu
    Zhang, Z. F.
    La Vecchia, C.
    Palli, D.
    Yu, G. P.
    Malekzadeh, R.
    Pastorino, R.
    Boccia, S.
    EUROPEAN JOURNAL OF PUBLIC HEALTH, 2018, 28 : 152 - 152
  • [8] Adult height and risk of gastric cancer: a pooled analysis within the Stomach cancer Pooling Project
    Giraldi, Luca
    Stojanovic, Jovana
    Arzani, Dario
    Persiani, Roberto
    Hu, Jinfu
    Johnson, Kenneth C.
    Zhang, Zuo-Feng
    Ferraroni, Monica
    Palli, Domenico
    Yu, Guo-Pei
    La Vecchia, Carlo
    Pelucchi, Claudio
    Lunet, Nuno
    Ferro, Ana
    Malekzadeh, Reza
    Muscat, Joshua
    Zaridze, David
    Maximovich, Dmitry
    Aragones, Nuria
    Martin, Vicente
    Vioque, Jesus
    Navarrete-Munoz, Eva M.
    Pakseresht, Mohammadreza
    Negri, Eva
    Rota, Matteo
    Pourfarzi, Farhad
    Mu, Lina
    Kurtz, Robert C.
    Lagiou, Areti
    Lagiou, Pagona
    Pastorino, Roberta
    Boccia, Stefania
    EUROPEAN JOURNAL OF CANCER PREVENTION, 2023, 32 (03) : 215 - 221
  • [9] The Uncertainty Analysis and Risk Assessment of Real Estate Project Planning and Designing
    Mao, Y. H.
    Deng, J.
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1059 - 1063
  • [10] Application of sensitivity analysis in investment project evaluation under uncertainty and risk
    Jovanovic, Petar
    International Journal of Project Management, 1999, 17 (04): : 217 - 222