Production lot sizing with process deterioration and machine breakdown under inspection schedule

被引:63
作者
Chakraborty, Tulika [1 ]
Giri, B. C. [1 ]
Chaudhuri, K. S. [1 ]
机构
[1] Jadavpur Univ, Dept Math, Kolkata 700032, India
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 2009年 / 37卷 / 02期
关键词
inventory; production; machine breakdown; inspection; maintenance; IMPERFECT PRODUCTION PROCESSES; PRODUCTION-INVENTORY SYSTEMS; PRODUCTION RUN-LENGTH; INTEGRATED PRODUCTION; JOINT DETERMINATION; QUALITY-CONTROL; EMQ MODEL; POLICY; BOUNDS;
D O I
10.1016/j.omega.2006.12.001
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The paper develops integrated production, inventory and maintenance models for a deteriorating production system in which the production facility may riot only shift from all 'in-control' state to air 'out-of-control' state hut also may break down at,my random point in time during a production run, In case of machine breakdown, production of the interrupted lot is aborted and a new production lot is started when the on-hand inventory is depleted after corrective repair. The process is inspected during each production run to examine the state of the production process. If it is found in the 'in-control' state then either (a) no action is taken except at the time of last inspection where preventive maintenance is done (inspection policy-I) or (h) preventive maintenance is performed (inspection policy-II). If. however, the process is found to be in the 'out-of-control' state at any inspection then restoration is done. The proposed models are formulated under general shift, breakdown and repair time distributions. As it is. in general. difficult to find the optimal production policy under inspection policy-I, a suboptimal production policy is derived. Numerical examples are taken to determine numerically the optimal/suboptimal production policies of the proposed models, to examine the sensitivity of important model parameters and to compare the performance of inspection and no inspection policies. (c) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:257 / 271
页数:15
相关论文
共 39 条
[1]  
[Anonymous], 2001, Integrated models in production planning, inventory, quality, and maintenance
[2]   PRODUCTION-INVENTORY SYSTEMS WITH UNRELIABLE MACHINES [J].
BERG, M ;
POSNER, MJM ;
ZHAO, H .
OPERATIONS RESEARCH, 1994, 42 (01) :111-118
[3]   The impact of imperfect processes on production run times [J].
Boone, T ;
Ganeshan, R ;
Guo, YM ;
Ord, JK .
DECISION SCIENCES, 2000, 31 (04) :773-787
[4]   Bounds for production lot sizing with machine breakdowns [J].
Chung, KJ .
COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 32 (01) :139-144
[5]  
CHUNG KL, 1997, NAV RES LOG, V44, P257
[6]   Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment [J].
Dohi, T ;
Okamura, H ;
Osaki, S .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 74 (1-3) :147-155
[7]  
DOHI T, 1997, INT J RELIABILITY QU, V4, P413
[8]   Exact formulation of stochastic EMQ model for an unreliable production system [J].
Giri, BC ;
Dohi, T .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2005, 56 (05) :563-575
[9]   PRODUCTION LOT SIZING WITH MACHINE BREAKDOWNS [J].
GROENEVELT, H ;
PINTELON, L ;
SEIDMANN, A .
MANAGEMENT SCIENCE, 1992, 38 (01) :104-123
[10]   PRODUCTION BATCHING WITH MACHINE BREAKDOWNS AND SAFETY STOCKS [J].
GROENEVELT, H ;
PINTELON, L ;
SEIDMANN, A .
OPERATIONS RESEARCH, 1992, 40 (05) :959-971