Biological phosphorus and nitrogen removal in sequencing batch reactors: effects of cycle length, dissolved oxygen concentration and influent particulate matter

被引:10
|
作者
Ginige, Maneesha P. [1 ]
Kayaalp, Ahmet S. [2 ]
Cheng, Ka Yu [1 ]
Wylie, Jason [1 ]
Kaksonen, Anna H. [1 ]
机构
[1] CSIRO Land & Water, Floreat, WA 6014, Australia
[2] Water Corp Western Australia, Leederville, WA 6007, Australia
关键词
biological P removal; EBPR; wastewater; ACTIVATED-SLUDGE; SYSTEMS; DIVERSITY; DYNAMICS;
D O I
10.2166/wst.2013.324
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Removal of phosphorus (P) and nitrogen (N) from municipal wastewaters is required to mitigate eutrophication of receiving water bodies. While most treatment plants achieve good N removal using influent carbon (C), the use of influent C to facilitate enhanced biological phosphorus removal (EBPR) is poorly explored. A number of operational parameters can facilitate optimum use of influent C and this study investigated the effects of cycle length, dissolved oxygen (DO) concentration during aerobic period and influent solids on biological P and N removal in sequencing batch reactors (SRBs) using municipal wastewaters. Increasing cycle length from 3 to 6 h increased P removal efficiency, which was attributed to larger portion of N being removed via nitrite pathway and more biodegradable organic C becoming available for EBPR. Further increasing cycle length from 6 to 8 h decreased P removal efficiencies as the demand for biodegradable organic C for denitrification increased as a result of complete nitrification. Decreasing DO concentration in the aerobic period from 2 to 0.8 mg L-1 increased P removal efficiency but decreased nitrification rates possibly due to oxygen limitation. Further, sedimented wastewater was proved to be a better influent stream than non-sedimented wastewater possibility due to the detrimental effect of particulate matter on biological nutrient removal.
引用
收藏
页码:982 / 990
页数:9
相关论文
共 50 条
  • [1] Effects of idle time on biological phosphorus removal by sequencing batch reactors
    Gao, Dawen
    Yin, Hang
    Liu, Lin
    Li, Xing
    Liang, Hong
    JOURNAL OF ENVIRONMENTAL SCIENCES, 2013, 25 (12) : 2396 - 2402
  • [2] Effect of influent concentration of COD on denitrifying phosphorus removal in sequencing batch reactor system
    Hu Yu-qin
    Ji Fang-ying
    Zuo Ning
    JOURNAL OF CENTRAL SOUTH UNIVERSITY OF TECHNOLOGY, 2006, 13 : 133 - 137
  • [3] Efects of idle time on biological phosphorus removal by sequencing batch reactors
    Dawen Gao
    Hang Yin
    Lin Liu
    Xing Li
    Hong Liang
    Journal of Environmental Sciences, 2013, (12) : 2396 - 2402
  • [4] AN ORP SCREENING PROTOCOL FOR BIOLOGICAL PHOSPHORUS REMOVAL IN SEQUENCING BATCH REACTORS
    WAREHAM, DG
    HALL, KJ
    MAVINIC, DS
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1995, 22 (02) : 260 - 269
  • [5] Efects of idle time on biological phosphorus removal by sequencing batch reactors
    Dawen Gao
    Hang Yin
    Lin Liu
    Xing Li
    Hong Liang
    Journal of Environmental Sciences, 2013, 25 (12) : 2396 - 2402
  • [6] Biological removal of carbon, nitrogen, and phosphorus in a sequencing batch reactor
    Akin, BS
    Ugurlu, AE
    JOURNAL OF ENVIRONMENTAL SCIENCE AND HEALTH PART A-TOXIC/HAZARDOUS SUBSTANCES & ENVIRONMENTAL ENGINEERING, 2003, 38 (08): : 1479 - 1488
  • [7] Nitrogen and phosphorus removal paths in a sequencing batch reactor - dependence on a dissolved oxygen profile in aerobic phases
    Podedworna, J.
    Zubrowska-Sudol, M.
    ENVIRONMENTAL ENGINEERING III, 2010, : 227 - 235
  • [8] Phosphorus and nitrogen removal in moving-bed sequencing batch biofilm reactors
    Pastorelli, G
    Canziani, R
    Pedrazzi, L
    Rozzi, A
    WATER SCIENCE AND TECHNOLOGY, 1999, 40 (4-5) : 169 - 176
  • [9] Biological processes of nitrogen removal and modeling oxygen diffusion in flocculent sludge and in granular sequencing batch reactors
    Bucci, Paula
    Alzate Marin, Juan C.
    Zaritzky, Noemi
    Caravelli, Alejandro
    JOURNAL OF CHEMICAL TECHNOLOGY AND BIOTECHNOLOGY, 2023, 98 (02) : 404 - 418
  • [10] Biological phosphorus removal in sequencing batch reactors with different solid retention times
    Henrique, Israel Nunes
    de Sousa, Jose Tavares
    Ovruski de Ceballos, Beatriz Susana
    Brasil, Danielle Patricio
    ENGENHARIA SANITARIA E AMBIENTAL, 2010, 15 (02) : 197 - 204