Application of a probabilistic risk assessment methodology to a lead smelter site

被引:23
|
作者
Griffin, S
Goodrum, PE
Diamond, GL
Meylan, W
Brattin, WJ
Hassett, JM
机构
[1] US EPA, Denver, CO 80202 USA
[2] SUNY Coll Environm Sci & Forestry, Fac Environm Resource & Forest Engn, Syracuse, NY 13210 USA
[3] Syracuse Res Corp, N Syracuse, NY 13212 USA
[4] ISSI Consulting Grp Inc, Denver, CO 80202 USA
来源
关键词
IEUBK; ISE; blood lead; Monte Carlo; uncertainty; variability;
D O I
10.1080/10807039991289699
中图分类号
X176 [生物多样性保护];
学科分类号
090705 ;
摘要
Exposure of children to lead in the environment was assessed at the Murray Smelter Superfund site using both a deterministic risk assessment approach, the Integrated Exposure Uptake Biokinetic (IEUBK) model, and a probabilistic approach, the Integrated Stochastic Exposure (ISE) model. When site-specific data on lead in environmental media were input as point estimates into the IEUBK model, unacceptable risks were predicted for children living within five of eight study zones. The predicted soil cleanup goal was 550 ppm. Concentration and exposure data were then input into the ISE model as probability distribution functions and a one-dimensional Monte Carlo analysis (1-D MCA) was run to predict the expected distribution of exposures and blood lead values. Uncertainty surrounding these predictions was examined in a two-dimensional Monte Carlo analysis (2-D MCA). The ISE model predicted risks that were in the same rank order as those predicted by the IEUBK model, although the probability estimates of exceeding a blood lead level of 10 mu g/dl (referred to as the P10) from the ISE model were uniformly lower than those predicted by the IEUBK model. The 2-D MCA allowed evaluation of the confidence around each P10 level, and identified the main sources of both uncertainty and variability in exposure estimates. The ISE model suggested cleanup goals ranging from 1300 to 1500 ppm might be protective at this site.
引用
收藏
页码:845 / 868
页数:24
相关论文
共 50 条
  • [1] Application of probabilistic risk assessment methodology to medical risk
    Miyata, Koichi
    Furuhama, Yutaka
    Yanagawa, Tatsuo
    Abstracts of the Pacific Basin Nuclear Conference, 2004,
  • [2] Space shuttle probabilistic risk assessment: Methodology and application
    Maggio, G
    ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 1996 PROCEEDINGS, 1996, : 121 - 132
  • [3] Contamination and Probabilistic Health Risk Assessment of Heavy Metals in Agricultural Soils Around a Lead-Zinc Smelter
    Huang J.-B.
    Jiang D.-D.
    Wen B.
    Wang L.
    Shi J.-Q.
    Zhou Y.
    Huanjing Kexue/Environmental Science, 2023, 44 (04): : 2204 - 2214
  • [4] Probabilistic risk assessment of a contaminated site
    Kuusisto, SM
    Tuhkanen, TA
    INTERNATIONAL CONFERENCE ON PRACTICAL APPLICATIONS IN ENVIRONMENTAL GEOTECHNOLOGY ECOGEO 2000, 2000, 204 : 273 - 280
  • [5] The use of the probabilistic risk assessment methodology for programmatic risk applications
    Mulvihill, RJ
    PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL I AND II, PROCEEDINGS, 2002, : 1483 - 1488
  • [6] Probabilistic risk assessment of radiotherapy application
    Ozbay, C.
    Ozbay, T.
    Yigitoglu, A. Guler
    Bayburt, M.
    RADIOPROTECTION, 2022, 57 (01) : 33 - 40
  • [7] Hybrid probabilistic and possibilistic safety assessment: Methodology and application
    Kato, K
    Amano, O
    Ueda, H
    Ikeda, T
    Yoshida, H
    Takase, H
    JSME INTERNATIONAL JOURNAL SERIES B-FLUIDS AND THERMAL ENGINEERING, 2002, 45 (03) : 626 - 630
  • [8] Hybrid Methodology and Software Platform for Probabilistic Risk Assessment
    Groth, Katrina
    Zhu, Dongfeng
    Mosleh, Ali
    ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2008 PROCEEDINGS, 2008, : 413 - +
  • [9] Application of probabilistic risk assessment at a coking plant site contaminated by polycyclic aromatic hydrocarbons
    Xia, Tianxiang
    Jiang, Lin
    Jia, Xiaoyang
    Zhong, Maosheng
    Liang, Jing
    FRONTIERS OF ENVIRONMENTAL SCIENCE & ENGINEERING, 2014, 8 (03) : 441 - 450
  • [10] Application of probabilistic risk assessment at a coking plant site contaminated by polycyclic aromatic hydrocarbons
    Tianxiang Xia
    Lin Jiang
    Xiaoyang Jia
    Maosheng Zhong
    Jing Liang
    Frontiers of Environmental Science & Engineering, 2014, 8 : 441 - 450