共 50 条
- [1] Dynamic Reentrant Scheduling Simulation for Assembly and Test Production Line in Semiconductor Industry MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-5, 2010, 97-101 : 2418 - 2422
- [2] Data-driven dynamic scheduling method for semiconductor production line Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2015, 32 (09): : 1233 - 1239
- [3] The new method of dynamic scheduling in semiconductor fabrication line 2004 8TH INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION, ROBOTICS AND VISION, VOLS 1-3, 2004, : 1874 - 1878
- [4] Dynamic scheduling approach based on SVM for semiconductor production line Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (03): : 733 - 739
- [5] Research on Dynamic Dispatching Rule for Semiconductor Assembly Production Line 2012 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2012, : 493 - 497
- [6] Dynamic Scheduling of a Semiconductor Production Line Based on a Composite Rule Set APPLIED SCIENCES-BASEL, 2017, 7 (10):
- [7] Approximate dynamic job-shop scheduling optimization for semiconductor assembly based on swarm intelligence Nanjing Li Gong Daxue Xuebao/Journal of Nanjing University of Science and Technology, 2009, 33 (SUPPL. 1): : 39 - 46
- [8] Scheduling Platform of Semiconductor Assembly and Test Producing Line ADVANCED MATERIALS AND COMPUTER SCIENCE, PTS 1-3, 2011, 474-476 : 764 - 770
- [9] A proposal of optimization methodology on manufacturing scheduling and its application into assembly production line in semiconductor manufacturing Nihon Kikai Gakkai Ronbunshu, C Hen/Transactions of the Japan Society of Mechanical Engineers, Part C, 2013, 79 (798): : 152 - 161
- [10] Dynamic Scheduling Method for Aircraft Moving Assembly Line Under Uncertain Supply of Material Tongji Daxue Xuebao/Journal of Tongji University, 2019, 47 (05): : 723 - 730and738