Preservation Strategies for Flexible Pavement Network of Washington State Department of Transportation

被引:2
|
作者
Luhr, David R. [1 ]
Li, Jianhua [1 ]
Uhlmeyer, Jeffrey S. [1 ]
Mahoney, Joe P. [2 ]
机构
[1] Washington State Dept Transportat, Olympia, WA 98504 USA
[2] Univ Washington, Dept Civil & Environm Engn, Seattle, WA 98195 USA
关键词
D O I
10.3141/2306-04
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The flexible pavement network of the Washington State Department of Transportation (DOT) consists of 11,600 lane miles of asphalt pavement and 4,600 lane miles of chip seal pavement. Every year a portion of those lane miles will require rehabilitation. However, budget shortfalls in the past decade have created a backlog of pavement rehabilitation needs that must be addressed. Funding forecasts for the next 10 years are for roughly one-half the levels of those before 2000. The ability to maintain a good performance level with reduced funding comes from using innovative techniques and picking the best investment alternatives. Through such strategies, preservation funds are allocated for preventive measures to extend pavement life. The Washington State DOT uses four basic steps to address this mission: (a) continually monitor the condition of the road network, (b) manage the pavement network into the lowest life-cycle cost, (c) create preventive strategies to extend pavement life and reduce costs, and (d) generate 2-year and 10-year plans for preservation of the road network that are based on rehabilitation needs and available resources. Preservation of the concrete network is considered separately. The use of the state's pavement management system provides a framework for evaluating and continually monitoring the performance of the state's roadway investments.
引用
收藏
页码:28 / 35
页数:8
相关论文
共 50 条
  • [1] Preservation Strategies for Concrete Pavement Network of Washington State Department of Transportation
    Li, Jianhua
    Luhr, David R.
    Uhlmeyer, Jeffrey S.
    Mahoney, Joe P.
    TRANSPORTATION RESEARCH RECORD, 2012, (2306) : 11 - 20
  • [2] Pavement Preservation Funding and Performance in Washington State
    Mahoney, Joe P.
    Uhlmeyer, Jeff
    Morin, Pat
    Luhr, David
    Willoughby, Kim
    Muench, Stephen T.
    Baker, Thomas
    TRANSPORTATION RESEARCH RECORD, 2010, (2150) : 55 - 62
  • [3] Washington State Department of Transportation Superpave implementation
    Leahy, RB
    Briggs, RN
    CONSTRUCTION 2001: MATERIALS AND CONSTRUCTION, 2001, (1761): : 32 - 40
  • [4] Washington State Department of Transportation superpave implementation
    Leahy, Rita B.
    Briggs, Robert N.
    Transportation Research Record, 2001, (1761) : 32 - 40
  • [5] Analysis of Washington State Department of Transportation Risks
    Dicks, Evan P.
    Molenaar, Keith R.
    TRANSPORTATION RESEARCH RECORD, 2023, 2677 (02) : 1690 - 1700
  • [6] Calibration of NCHRP 1-37A software for the Washington State Department of Transportation - Rigid pavement portion
    Li, Jianhua
    Muench, Stephen T.
    Mahoney, Joe P.
    Sivaneswaran, Nadarajah
    Pierce, Linda M.
    PAVEMENT REHABILITATION, STRENGTH AND DEFORMATION CHARACTERISTICS, AND SURFACE PROPERTIES-VEHICLE INTERACTION 2006, 2006, (1949): : 43 - 53
  • [7] The highway development and management system in Washington State - Calibration and application for the Department of Transportation Road Network
    Li, JH
    Muench, ST
    Mahoney, JP
    Sivaneswaran, N
    Pierce, LM
    White, GC
    PRESERVATION OF ROADWAY STRUCTURES AND PAVEMENTS, 2005, (1933): : 53 - 61
  • [8] Calibration of Flexible Pavement in Mechanistic-Empirical Pavement Design Guide for Washington State
    Li, Jianhua
    Pierce, Linda M.
    UhImeyer, Jeff
    TRANSPORTATION RESEARCH RECORD, 2009, (2095) : 73 - 83
  • [9] Bituminous Surface Treatment Protocol for the Washington State Department of Transportation
    Li, Jianhua
    Mahoney, Joe P.
    Muench, Stephen T.
    Pierce, Linda M.
    TRANSPORTATION RESEARCH RECORD, 2008, (2084) : 65 - 72
  • [10] Washington State Department of Transportation Plan for Accelerated Bridge Construction
    Khaleghi, Bijan
    TRANSPORTATION RESEARCH RECORD, 2010, (2200) : 3 - 11