Boiler erection scheduling using product models and case-based reasoning

被引:23
|
作者
Dzeng, RJ
Tommelein, ID
机构
[1] Civ. Engrg. Dept., National Chiao Tung Univ., Hsinchu
[2] Civ. and Envir. Engrg. Dept., 215-A McLaughlin Hall, Univ. of California, Berkeley, Berkeley
关键词
D O I
10.1061/(ASCE)0733-9364(1997)123:3(338)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Contractors who repeatedly construct facilities designed by copying major parts from one project to the next find that previously developed schedules associated with those designs could be reused to schedule new work. To facilitate such reuse, project characteristics must be articulated and associated schedules described to include not only traditional, numerical scheduling data, but also scheduling constraints. In addition, knowledge about how to reuse schedules must be available. The CasePlan system, presented here, supports and augments the scheduling activity of people who reason about cases-each case describing the design and schedule of a completed project-to generate new project schedules. Specifically, CasePlan reuses annotated cases to automatically schedule the erection of power plant boilers. Because such boilers have a more-or-less standardized design, a generic boiler product model can serve as the basis for assessing similarities between designs. On this basis CasePlan selects schedules for reuse. A user can also interact with CasePlan to isolate fragments of case schedules and adapt them to better suit the variables of the new project at hand.
引用
收藏
页码:338 / 347
页数:10
相关论文
共 50 条
  • [1] Case-based reasoning in scheduling
    MacCarthy, BL
    Jou, P
    ADVANCED MANUFACTURING PROCESSES, SYSTEMS, AND TECHNOLOGIES (AMPST 96), 1996, : 211 - 218
  • [2] Case-based reasoning for production scheduling
    Universitaet des Saarlandes, Saarbruecken, Germany
    Int J Prod Econ, (537-546):
  • [3] Case-based reasoning for production scheduling
    Schmidt, G
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1998, 56-7 : 537 - 546
  • [4] Product Recommendation in Case-based Reasoning
    Aldayel, Mashael
    Benhidour, Hafida
    2019 2ND INTERNATIONAL CONFERENCE ON COMPUTER APPLICATIONS & INFORMATION SECURITY (ICCAIS), 2019,
  • [5] Scheme design based on case-based reasoning in utility boiler
    Institute of Chemical Machine, Zhejiang University, Hangzhou 310027, China
    不详
    Jisuanji Jicheng Zhizao Xitong, 2008, 1 (1-5+78):
  • [6] A case-based reasoning approach for production scheduling
    Schmidt, G.
    Meyer, J.
    Wirtschaftsinformatik, 38 (01):
  • [7] A case-based reasoning approach for production scheduling
    Schmidt, G
    Meyer, J
    WIRTSCHAFTSINFORMATIK, 1996, 38 (01): : 57 - 60
  • [8] Self-Optimization module for Scheduling using Case-based Reasoning
    Pereira, I.
    Madureira, A.
    APPLIED SOFT COMPUTING, 2013, 13 (03) : 1419 - 1432
  • [9] Fast Scheduling of Semiconductor Manufacturing Facilities Using Case-Based Reasoning
    Lim, Junseok
    Chae, Moon-Jung
    Yang, Yongseok
    Park, In-Beom
    Lee, Jaeyong
    Park, Jonghun
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2016, 29 (01) : 22 - 32
  • [10] Strategy selection for product service systems using case-based reasoning
    Lin, Kun-Hsiang
    Shih, Li-Hsing
    Lu, Shing-Shuen
    Lin, Yung-The
    AFRICAN JOURNAL OF BUSINESS MANAGEMENT, 2010, 4 (06): : 987 - 994