A study of technical, economic and social factors affecting micro-hydropower plants in Nepal

被引:0
|
作者
Butchers, Joe [1 ]
Williamson, Sam [1 ]
Booker, Julian [1 ]
Anh Tran [2 ]
Gautam, Biraj [3 ]
Karki, Prem Bikram [3 ]
机构
[1] Univ Bristol, Elect Energy Management Grp, Bristol, Avon, England
[2] Coventry Univ, Sch Energy Construct & Environm, Coventry, W Midlands, England
[3] People Energy & Environm Dev Assoc, Kathmandu, Nepal
基金
英国工程与自然科学研究理事会;
关键词
Nepal; micro-hydropower; social; technical; economic;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Due to slow expansion of the national grid, many rural areas of Nepal depend on micro-hydropower plants to provide electricity to homes and businesses. Micro-hydro turbines are designed, manufactured and installed by small and medium sized enterprises based in Nepal. After a plant is commissioned, its technical and economic operation is managed by selected members of the local community. When problems affect the plant, people are forced to rely on traditional or fossil fuel-based technologies to provide light to their homes, whilst many businesses cannot run without a supply of electricity. A study of 24 sites (18 Crossflow and 6 Pelton turbines) looked to identify the combination of technical, social and economic factors that affect the performance and reliability of plants. Interviews were carried out with plant operators, plant managers, and consumers to understand how the plant is run and managed, and the position it occupies in the local community. A quantitative assessment of maintenance and observation of 10 sub-systems was conducted at each site. The information collected demonstrated that the social and economic impact at home and in the community mean that micro-hydropower plants are highly valued. However, it was found that 40% of managers reported that monthly payments were not always sufficient to pay for repairs. By combining information on the domestic and commercial end uses, financially threatened sites have been identified. At the sites with trained operators, a higher quality of maintenance was found. Across all of the sites, problems at all sub-systems which could weaken performance and increase running costs have been identified.
引用
收藏
页数:8
相关论文
共 50 条
  • [1] Strategic rehabilitation of the earthquake affected micro-hydropower plants in Nepal
    Baidar, B.
    Koirala, R.
    Neopane, H. P.
    Shrestha, M. V.
    Thapa, B.
    28TH IAHR SYMPOSIUM ON HYDRAULIC MACHINERY AND SYSTEMS (IAHR2016), PTS 1-12, 2016, 49
  • [2] Understanding sustainable operation of micro-hydropower: a field study in Nepal
    Butchers, Joe
    Williamson, Sam
    Booker, Julian
    Tran, Anh
    Karki, Prem Bikram
    Gautam, Biraj
    ENERGY FOR SUSTAINABLE DEVELOPMENT, 2020, 57 : 12 - 21
  • [3] Cost estimation of micro-hydropower equipment in Nepal
    Butchers J.
    Williamson S.
    Booker J.
    Maitland T.
    Karki P.B.
    Pradhan B.R.
    Pradhan S.R.
    Gautam B.
    Development Engineering, 2022, 7
  • [4] Experimental Study of Micro-Hydropower Plants. Calculation of Water Wheel Efficiency
    G. U. Makhkamov
    U. A. Khakimov
    Russian Engineering Research, 2023, 43 (12) : 1524 - 1527
  • [5] A strategic assessment of micro-hydropower in the UK and Irish water industry: Identifying technical and economic constraints
    Gallagher, J.
    Harris, I. M.
    Packwood, A. J.
    McNabola, A.
    Williams, A. P.
    RENEWABLE ENERGY, 2015, 81 : 808 - 815
  • [6] Design and implementation of an electromechanical control system for micro-hydropower plants
    Asad Ali
    Muftooh Ur Rehman Siddiqi
    Riaz Muhammad
    M. Arshad
    Nasim Suleman
    Electrical Engineering, 2020, 102 : 891 - 898
  • [7] Experimental Studies of Micro-Hydropower Plants with Siphon Water Intake
    Krylov A.P.
    Bakshtanin A.M.
    Beglyarova E.S.
    Power Technology and Engineering, 2021, 55 (03) : 321 - 325
  • [8] A Control Scheme for Variable-Speed Micro-Hydropower Plants
    Fan, Youping
    Zhang, Dai
    Li, Jingjiao
    SUSTAINABILITY, 2018, 10 (11):
  • [9] Prospects of micro-hydropower plants in Northeast India: a brief review
    Deshamukhya T.
    Choubey G.
    International Journal of Energy and Water Resources, 2023, 7 (2) : 297 - 308
  • [10] Design and implementation of an electromechanical control system for micro-hydropower plants
    Ali, Asad
    Siddiqi, Muftooh Ur Rehman
    Muhammad, Riaz
    Arshad
    Suleman, M.
    Ullah, Nasim
    ELECTRICAL ENGINEERING, 2020, 102 (02) : 891 - 898