On the conditional performance of the synthetic chart with unknown process parameters using the exceedance probability criterion

被引:2
|
作者
Hu, XueLong [1 ,2 ]
Tang, AnAn [1 ]
Qiao, YuLong [3 ]
Sun, JinSheng [3 ]
Guo, BaoCai [4 ]
机构
[1] Nanjing Univ Posts & Telecommun, Sch Management, Nanjing, Peoples R China
[2] Nanjing Univ Posts & Telecommun, Inst High Qual Dev Evaluat, Nanjing, Peoples R China
[3] Nanjing Univ Sci & Technol, Sch Automat, Nanjing, Peoples R China
[4] Zhejiang Gongshang Univ, Sch Stat & Math, Hangzhou, Zhejiang, Peoples R China
来源
PLOS ONE | 2020年 / 15卷 / 10期
关键词
IN-CONTROL PERFORMANCE; OPTIMAL-DESIGN; (X)OVER-BAR; DISPERSION;
D O I
10.1371/journal.pone.0239538
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Recent researches on the control charts with unknown process parameters have noticed the large variability in the conditional in-control average run length (ARL) performance of control charts, especially when a small number of Phase I samples is used to estimate the process parameters. Some research works have been conducted on the conditional ARL performance of different types of control charts. In this paper, by simulating the empirical distribution of the conditional ARL and especially using the exceedance probability criterion (EPC), we study the conditional ARL performance of the synthetic (X) over bar chart. Our results show that a large amount of Phase I samples is needed to obtain a specified EPC of the synthetic chart. For the available number of Phase I samples, the control limits of the synthetic chart are adjusted using the EPC method to improve its conditional in-control performance. It is shown that, for small mean shift sizes, a tradeoff should be made between the conditional in-control and out-of-control performances. For moderate to large shifts, the conditional performance of the synthetic chart using the adjusted control limits is generally satisfied. By comparing the results with the ones using the bootstrap approach, it can also be concluded that the conditional performances of both approaches are comparable. While the method proposed in this paper requires much less computation work than the bootstrap approach.
引用
收藏
页数:20
相关论文
共 50 条
  • [1] Conditional median run length performance of the synthetic X over bar chart with unknown process parameters
    Hu, XueLong
    Castagliola, Philippe
    Tang, AnAn
    Zhou, XiaoJian
    Zhou, PanPan
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2020, 36 (03) : 1111 - 1131
  • [2] Conditional design of the CUSUM median chart for the process position when process parameters are unknown
    Hu, X. L.
    Castagliola, P.
    Tang, A. A.
    JOURNAL OF STATISTICAL COMPUTATION AND SIMULATION, 2019, 89 (13) : 2468 - 2488
  • [3] Conditional design of the Shewhart X chart with unknown process parameters based on median run length
    Hu, XueLong
    Castagliola, Philippe
    Tang, AnAn
    Zhou, XiaoJian
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2023, 17 (01) : 90 - 114
  • [4] Guaranteed conditional performance of the median run length based EWMA (X)over-bar chart with unknown process parameters
    Hu, XueLong
    Castagliola, Philippe
    Tang, Anan
    Zhong, Jianlan
    COMMUNICATIONS IN STATISTICS-SIMULATION AND COMPUTATION, 2021, 50 (12) : 4280 - 4299
  • [5] The Influence of Unknown Parameters in AR(2) Process to the Control Chart's Performance
    Sun, Qiuxia
    Gao, Qisheng
    26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 1834 - 1838
  • [6] A Study on a Memory Type EWMA Control Chart with Unknown Process Parameters
    You, H. W.
    Khoo, Michael B. C.
    2015 INTERNATIONAL CONFERENCE ON RESEARCH AND EDUCATION IN MATHEMATICS (ICREM7), 2015, : 246 - 249
  • [7] Generalized skewness correction structure of (X)over-bar control chart for unknown process parameters and skewed probability distributions
    Mehmood, Rashid
    Lee, Muhammad Hisyam
    Afzel, Ambreen
    Bashir, Sheraz
    Riaz, Muhammad
    JOURNAL OF STATISTICAL COMPUTATION AND SIMULATION, 2020, 90 (08) : 1349 - 1372
  • [8] Mean control chart based on ranked set schemes for unknown skewed probability distribution and parameters
    Riaz, Muhammad
    Mehmood, Rashid
    Rehman, Masooda
    Ali, Iftikhar
    Zaman, Babar
    CONCURRENCY AND COMPUTATION-PRACTICE & EXPERIENCE, 2022, 34 (21):
  • [9] Estimation of the Conditional Probability Using a Stochastic Gradient Process
    Labriji, Ali
    Bennar, Abdelkrim
    Rachik, Mostafa
    JOURNAL OF MATHEMATICS, 2021, 2021
  • [10] Optimal design of a synthetic chart for monitoring process dispersion with unknown in-control variance
    Guo, Baocai
    Wang, Bing Xing
    Cheng, Yuan
    COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 88 : 78 - 87