摘要
Test results for the surveillance capsule 3L RPV of Zaporozhye NPP power unit No. 2 are presented. Radiation embrittlement coefficients for base and weld metals were obtained from impact bending tests. The critical RPV element as regards radiation embrittlement is shown to be the base metal.
引用
收藏
页码:477 / 481
页数:5
相关论文
共 32 条
  • [1] Embrittlement Behavior of the RPV Metal of Power Unit No. 2 at the Zaporozhye NPP
    V. M. Revka
    O. V. Trygubenko
    Yu. V. Chaikovs’kii
    L. I. Chyrko
    Strength of Materials, 2013, 45 : 477 - 481
  • [2] Phosphorous content and distribution in the NPP Kozloduy RPV Unit 1 Weld 4 metal
    Vodenicharov, S
    Kamenova, T
    Gaidarova, V
    Momchilova, E
    NUCLEAR ENGINEERING AND DESIGN, 1999, 191 (03) : 335 - 339
  • [3] Operating experience with the system for identifying a leak in power unit no. 2 of the Armenian nuclear power plant (NPP)
    Petrosyan, V.G.
    Shakhverdyan, S.V.
    Asatryan, V.G.
    Teploenergetika, 2001, (12): : 22 - 25
  • [4] Estimation of the fuel quantity in the underreactor room No. 305/2 of the 4th power unit of the Chernobyl NPP
    Borovoj, A.A.
    Lagunenko, A.S.
    Pazukhin, E.M.
    Atomnaya Energiya, 1998, 84 (04): : 356 - 362
  • [5] The results of research of mechanical properties of the pipelines metal of power unit No. 3 South-Ukrainian NPP after 100,000 hours of exploitation
    Neklyudov, I. M.
    Azhazha, V. M.
    Ozhigov, L. S.
    Bryk, V. V.
    Savchenko, V. I.
    Gozhenko, S. V.
    Mishchenko, P. A.
    PROBLEMS OF ATOMIC SCIENCE AND TECHNOLOGY, 2007, (02): : 101 - 106
  • [6] Nominal Power Assimilation in Leningradskaya NPP No. 1 Unit After Service Life Characteristics Restoration of the Graphite Stack
    V. P. Vasilevskii
    A. V. Maslennikov
    I. N. Lozhnikov
    Atomic Energy, 2018, 123 : 326 - 331
  • [7] Nominal Power Assimilation in Leningradskaya NPP No. 1 Unit After Service Life Characteristics Restoration of the Graphite Stack
    Vasilevskii, V. P.
    Maslennikov, A. V.
    Lozhnikov, I. N.
    ATOMIC ENERGY, 2018, 123 (05) : 326 - 331
  • [8] Simulation of standard temperature control indications at the outlet of a fuel assembly of VVER1000 reactor of Rostov NPP unit No. 2
    Oleksyuk, D. A.
    Bugayeva, V. A.
    Kireeva, D. R.
    KERNTECHNIK, 2018, 83 (04) : 331 - 340
  • [9] Operating experience with the system for identifying a leak in power unit no. 2 of the Armenian nuclear power station (NPS)
    Petrosyan, V.G.
    Shakhverdyan, S.V.
    Asatryan, V.G.
    Thermal Engineering, 2001, 48 (12) : 993 - 997
  • [10] Results from tests of modernized moisture separator-reheater of K-500-65/3000 turbine plants of the power unit No. 4 at the Leningrad Nuclear Power Plants (NPP)
    M. A. Gotovskii
    B. S. Fokin
    M. Ya. Belen’kii
    M. E. Lebedev
    M. A. Blinov
    M. Yu. Egorov
    Thermal Engineering, 2012, 59 (2) : 113 - 118