Pareto-based discrete harmony search algorithm for flexible job shop scheduling

被引:0
|
作者
Gao, K. Z. [1 ]
Suganthan, P. N. [1 ]
Chua, T. J. [2 ]
机构
[1] Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore
[2] Singapore Inst Mfg Technol, Singapore, Singapore
关键词
discrete harmony search; flexible job shop scheduling; makespan; earliness; tardiness; GENETIC ALGORITHM; FLOW-SHOP; OPTIMIZATION;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper proposes a pareto-based discrete harmony search (PDHS) algorithm to solve multi-objective FJSP. The objectives are the minimization of two criteria namely, the maximum of the completion time (Makespan) and the mean earliness and tardiness. Firstly, we develop a new method for the initial the machine assignment task. Some existing heuristics are also employed for initializing the harmony memory. Hence, harmony memory is filled with discrete machine permutation for machine assignment and job permutation for operation sequence. Secondly, we develop a new rule for the improvisation to produce a new harmony for FJSP. The machine assignment and operation sequence are processed respectively. Thirdly, several local search methods are embedded to enhance the algorithm's local exploitation ability. Finally, extensive computational experiments are carried out using well-known benchmark instances. Computational results and comparisons show the efficiency and effectiveness of the proposed pareto-based discrete harmony search algorithm for solving the multi-objective flexible job-shop scheduling problem.
引用
收藏
页码:953 / 956
页数:4
相关论文
共 50 条
  • [1] Pareto-based grouping discrete harmony search algorithm for multi-objective flexible job shop scheduling
    Gao, K. Z.
    Suganthan, P. N.
    Pan, Q. K.
    Chua, T. J.
    Cai, T. X.
    Chong, C. S.
    INFORMATION SCIENCES, 2014, 289 : 76 - 90
  • [2] A hybrid Pareto-based local search algorithm for multi-objective flexible job shop scheduling problems
    Li, Jun-Qing
    Pan, Quan-Ke
    Chen, Jing
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (04) : 1063 - 1078
  • [3] Discrete harmony search algorithm for flexible job shop scheduling problem with multiple objectives
    K. Z. Gao
    P. N. Suganthan
    Q. K. Pan
    T. J. Chua
    T. X. Cai
    C. S. Chong
    Journal of Intelligent Manufacturing, 2016, 27 : 363 - 374
  • [4] Discrete harmony search algorithm for flexible job shop scheduling problem with multiple objectives
    Gao, K. Z.
    Suganthan, P. N.
    Pan, Q. K.
    Chua, T. J.
    Cai, T. X.
    Chong, C. S.
    JOURNAL OF INTELLIGENT MANUFACTURING, 2016, 27 (02) : 363 - 374
  • [5] Pareto-based discrete artificial bee colony algorithm for multi-objective flexible job shop scheduling problems
    Li, Jun-Qing
    Pan, Quan-Ke
    Gao, Kai-Zhou
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 55 (9-12): : 1159 - 1169
  • [6] Pareto-based discrete artificial bee colony algorithm for multi-objective flexible job shop scheduling problems
    Jun-Qing Li
    Quan-Ke Pan
    Kai-Zhou Gao
    The International Journal of Advanced Manufacturing Technology, 2011, 55 : 1159 - 1169
  • [7] Hybrid Pareto-based tabu search algorithm for solving the multi-objective flexible Job Shop scheduling problem
    Li, Jun-Qing
    Pan, Quan-Ke
    Wang, Yu-Ting
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (07): : 1419 - 1426
  • [8] A hybrid Pareto-based local search for multi-objective flexible job shop scheduling problem
    Li, Junqing
    Pan, Quanke
    2010 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2010,
  • [9] A hybrid harmony search algorithm for the flexible job shop scheduling problem
    Yuan, Yuan
    Xu, Hua
    Yang, Jiadong
    APPLIED SOFT COMPUTING, 2013, 13 (07) : 3259 - 3272
  • [10] An effective discrete harmony search algorithm for flexible job shop scheduling problem with fuzzy processing time
    Gao, Kai Zhou
    Suganthan, Ponnuthurai Nagaratnam
    Pan, Quan Ke
    Tasgetiren, Mehmet Fatih
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (19) : 5896 - 5911