Planning Solar Array Operations on the International Space Station

被引:4
|
作者
Reddy, Sudhakar Y. [1 ]
Frank, Jeremy D. [2 ]
Iatauro, Michael J. [2 ]
Boyce, Matthew E. [2 ]
Kuerklue, Elif [2 ]
Al-Chang, Mitchell [2 ]
Jonsson, Ari K. [3 ]
机构
[1] Boeing Co, Huntington Beach, CA 92647 USA
[2] NASA, Ames Res Ctr, Washington, DC USA
[3] Reykjavik Univ, IS-101 Reykjavik, Iceland
关键词
Algorithms; Planning; scheduling; constraint satisfaction; optimization; space mission operations;
D O I
10.1145/1989734.1989745
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Flight controllers manage the orientation and modes of eight large solar arrays that power the International Space Station (ISS). The task requires generating plans that balance complex constraints and preferences. These considerations include context-dependent constraints on viable solar array configurations, temporal limits on transitions between configurations, and preferences on which considerations have priority. The Solar Array Constraint Engine (SACE) treats this operations planning problem as a sequence of tractable constrained optimization problems. SACE uses constraint management and automated planning capabilities to reason about the constraints, to find optimal array configurations subject to these constraints and solution preferences, and to automatically generate solar array operations plans. SACE further provides flight controllers with real-time situational awareness and what-if analysis capabilities. SACE is built on the Extensible Universal Remote Operations Planning Architecture (EUROPA) model-based planning system. EUROPA facilitated SACE development by providing model-based planning, built-in constraint reasoning capability, and extensibility. This article formulates the planning problem, explains how EUROPA solves the problem, and provides performance statistics from several planning scenarios. SACE reduces a highly manual process that takes weeks to an automated process that takes tens of minutes.
引用
收藏
页数:24
相关论文
共 50 条
  • [1] Operations planning for the international space station
    Leuttgens, R.
    Volpp, J.
    European Space Agency Bulletin, 1998, (94): : 57 - 63
  • [2] Operations planning for the International Space Station
    Leuttgens, R
    Volpp, J
    ESA BULLETIN-EUROPEAN SPACE AGENCY, 1998, (94) : 57 - 63
  • [3] NASA tests new solar array on International Space Station
    不详
    PHOTONICS SPECTRA, 2017, 51 (10) : 16 - 17
  • [4] Anomaly simulation and resolution of international space station solar array deployment
    Wu, SC
    Ghofranian, S
    Modeling, Simulation, and Verification of Space-Based Systems II, 2005, 5799 : 38 - 47
  • [5] International space station operations: A preview
    Suzuki, N
    SPACE COOPERATION INTO THE 21ST CENTURY, 1997, 96 : 897 - 897
  • [6] Mitigation of thruster plume erosion of International Space Station solar array coatings
    Pankop, CA
    Alred, JW
    Boeder, PA
    JOURNAL OF SPACECRAFT AND ROCKETS, 2006, 43 (03) : 545 - 550
  • [7] Space Station Solar Array Joint Repair
    Loewenthal, Stuart
    Allmon, Curtis
    Reznik, Carter
    Mcfatter, Justin
    Davis, Robert E.
    MATERIALS PERFORMANCE AND CHARACTERIZATION, 2015, 4 (01) : 200 - 208
  • [8] OPERATIONS PLANNING KEY TO A SUCCESSFUL SPACE STATION FACILITY
    KLINE, RL
    SPACE TECHNOLOGY-INDUSTRIAL AND COMMERCIAL APPLICATIONS, 1987, 7 (03): : 193 - 204
  • [9] STRATEGIC-PLANNING FOR THE INTERNATIONAL SPACE STATION
    GRINER, CS
    ACTA ASTRONAUTICA, 1991, 24 : 55 - 60
  • [10] Microdisturbances on the International Space Station during dynamic operations
    Belyaev, M. Yu.
    Volkov, O. N.
    Ryabukha, S. B.
    COSMIC RESEARCH, 2013, 51 (04) : 270 - 274