YARD CRANE DISPATCHING TO MINIMIZE VESSEL TURNAROUND TIMES IN CONTAINER TERMINALS

被引:0
|
作者
Huang, Shell Ying [1 ]
Li, Ya [1 ]
Guo, Xi [1 ]
机构
[1] Nanyang Technol Univ, Sch Comp Engn, Singapore 639798, Singapore
关键词
LOADING OUTBOUND CONTAINERS; ALGORITHM; OPERATIONS; OPTIMIZATION; SYSTEMS;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Yard crane (YC) dispatching in the operational planning of container terminals usually aims to minimize makespan of YC operations or waiting time of vehicles. We propose that minimizing the maximum tardiness of vehicle jobs at yard blocks will minimize the operational delay of the longest quay crane (QC). This will minimize vessel turnaround time which is one of the most important objectives of container terminals. A provably optimal algorithm, MMT-RBA* to minimize maximum job tardiness, is presented to sequence the YC jobs. Jobs requiring reshuffling of other containers, often ignored in other studies, are handled by embedded simulation in our optimization algorithms. Another provably optimal algorithm, MMS-RBA* to minimize makespan, is also presented. Simulation experiments confirm that MMT-RBA* significantly outperforms the optimal algorithm RBA* to minimize vehicle waiting time from earlier studies and MMS-RBA* to minimize makespan in minimizing vessel turnaround time.
引用
收藏
页码:1747 / 1758
页数:12
相关论文
共 50 条
  • [1] Yard Crane Dispatching to Minimize Total Weighted Vessel Turnaround Times in Container Terminals
    Huang, Shell Ying
    Li, Ya
    COMPUTATIONAL LOGISTICS (ICCL 2015), 2015, 9335 : 267 - 280
  • [2] EMBEDDING SIMULATION IN YARD CRANE DISPATCHING TO MINIMIZE JOB TARDINESS IN CONTAINER TERMINALS
    Huang, Shell Ying
    Guo, Xi
    Hsu, Wen Jing
    Lim, Wei Lin
    2012 WINTER SIMULATION CONFERENCE (WSC), 2012,
  • [3] Performing A* Search for Yard Crane Dispatching in Container Terminals
    Guo, Xi
    Huang, Shell Ying
    20TH IEEE INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE, VOL 1, PROCEEDINGS, 2008, : 263 - 267
  • [4] Yard crane scheduling to minimize total weighted vessel loading time in container terminals
    Shell Ying Huang
    Ya Li
    Flexible Services and Manufacturing Journal, 2017, 29 : 689 - 720
  • [5] Yard crane scheduling to minimize total weighted vessel loading time in container terminals
    Huang, Shell Ying
    Li, Ya
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2017, 29 (3-4) : 689 - 720
  • [6] A SIMULATION BASED HYBRID ALGORITHM FOR YARD CRANE DISPATCHING IN CONTAINER TERMINALS
    Guo, Xi
    Huang, Shell Ying
    Hsu, Wen Jing
    Low, Malcolm Yoke Hean
    PROCEEDINGS OF THE 2009 WINTER SIMULATION CONFERENCE (WSC 2009 ), VOL 1-4, 2009, : 2230 - 2241
  • [7] Dynamic yard crane dispatching in container terminals with predicted vehicle arrival information
    Guo, Xi
    Huang, Shell Ying
    Hsu, Wen Jing
    Low, Malcolm Yoke Hean
    ADVANCED ENGINEERING INFORMATICS, 2011, 25 (03) : 472 - 484
  • [8] YARD CRANE DEPLOYMENT IN CONTAINER TERMINALS
    Huang, Shell Ying
    Li, Ya
    Lau, Meimei
    Tay, Teck Chin
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 1735 - 1746
  • [9] YARD CRANE DISPATCHING BASED ON REAL TIME DATA DRIVEN SIMULATION FOR CONTAINER TERMINALS
    Guo, Xi
    Huang, Shell Ying
    Hsu, Wen Jing
    Low, Malcolm Yoke Hean
    2008 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2008, : 2648 - 2655
  • [10] Yard crane scheduling in port container terminals
    Ng, WC
    Mak, KL
    APPLIED MATHEMATICAL MODELLING, 2005, 29 (03) : 263 - 276