Construction challenges for soft ground tunneling

被引:0
|
作者
McBain, GW
Meiorin, L
Kaneshiro, JY
Navin, SJ
Lee, RH
机构
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
For more than 60 years, raw sewage has flowed down the hills of Tijuana, Mexico into the Tijuana River, crossing the U.S.-Mexican border. The sewage contaminates the low-lying river valley in San Diego and then flows into the Pacific Ocean, creating a health hazard for beaches at Border Field State Park, Silver Strand Beach in Coronado, and the most severely affected, Imperial Beach. To alleviate these problems, the South Bay Ocean Outfall (SBOO) will convey effluent down a 11 m diameter by 58 m deep drop shaft, through a 3.35 m diameter by 5.8 km long tunnel, and up a 46 m high by 2.7 m diameter riser shaft connecting to a 1.5 km seafloor pipeline and 1.2 km of diffusers on the ocean floor.
引用
收藏
页码:681 / 691
页数:11
相关论文
共 50 条
  • [1] Soft ground subway construction: Challenges and solutions
    Dickson, JRV
    Irshad, M
    NORTH AMERICAN TUNNELING '96, VOLS 1 AND 2, 1996, : 133 - 143
  • [2] The risk of third parties from soft ground tunneling construction in urban areas
    Dai, Renping
    Gong, Quanmei
    Zhou, Shunhua
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & GLOBAL E-BUSINESS, VOLS I AND II, 2009, : 1266 - 1270
  • [3] Long-term settlement and construction disturbance during shield tunneling in soft ground
    Zhu, Qi-Yin
    Ye, Guan-Lin
    Wang, Jian-Hua
    Xia, Xiao-He
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2010, 32 (SUPPL. 2): : 509 - 512
  • [5] Tunneling through soft ground using ground freezing
    CDM Consult GmbH, Germany
    不详
    Civil Engineering Practice, 2006, 21 (01): : 45 - 70
  • [6] Soft ground tunneling in Chicago clay
    Nasri, V.
    Ayoubian, A.
    NORTH AMERICAN TUNNELING 2006, 2006, : 313 - +
  • [7] Comparison of shallow tunneling method with pile and rib method for construction of subway station in soft ground
    Sina Amiri
    Ali Naghi Dehghan
    Frontiers of Structural and Civil Engineering, 2022, 16 : 704 - 717
  • [8] Comparison of shallow tunneling method with pile and rib method for construction of subway station in soft ground
    Sina AMIRI
    Ali Naghi DEHGHAN
    Frontiers of Structural and Civil Engineering, 2022, 16 (06) : 704 - 717
  • [9] Comparison of shallow tunneling method with pile and rib method for construction of subway station in soft ground
    Amiri, Sina
    Dehghan, Ali Naghi
    FRONTIERS OF STRUCTURAL AND CIVIL ENGINEERING, 2022, 16 (06) : 704 - 717
  • [10] Predicting boulder cutting in soft ground tunneling
    Goss, CM
    NORTH AMERICAN TUNNELING 2002, 2002, : 37 - 46