Flexibility in manufacturing automation: A living lab case study of Norwegian metalcasting SMEs

被引:40
|
作者
Wadhwa, Rhythm Suren [1 ]
机构
[1] NTNU Valgrinda, Inst Prod & Kvalitetstek, N-7491 Trondheim, Norway
关键词
SME metalcasting; Foundry automation; Manufacturing flexibility; Operations; Norway; SYSTEMS;
D O I
10.1016/j.jmsy.2012.07.008
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Flexibility can be defined as the ability to respond efficiently to the changing demands of the customer and is different in SMEs (Small-to-Medium manufacturing Enterprises) than the traditional OEMs (Original Equipment Manufacturers). Costs involved in implementing manufacturing flexibility to meet customer demand are more important in the SMEs, especially that are labor intensive for example metalcasting companies, when located in a high cost country like Norway. Therefore the Norwegian Research Council initiated the Autocast project to promote SME business cooperation and flexibility by automating the manufacturing processes within the Norwegian casting/foundry SMEs. The project intends to identify and improve the areas crucial for flexible manufacturing to help SMEs stay competitive in global competition. Literature confirms the difficulty in the development of objective measures for flexibility, for example, because of its property of multidimensionality. Nevertheless, an attempt has been made in this paper to identify the suitability of essential spheres of manufacturing flexibility to a foundry set-up accompanied by two living lab foundry case studies. The paper also completes the set of design rules specifically for foundry automation and assist flexibility in manufacturing. Efforts have been made to sustain the existing flexible automation implementation on the basis of poka-yoke principles. The findings from the living lab case study assist in proposing the design for flexible foundry automation (DFFFA) guidelines for flexible automation in a consortium collaborative environment could allow for better response to customer needs and support on-the-move interaction collaboration. (C) 2012 The Society of Manufacturing Engineers. Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:444 / 454
页数:11
相关论文
共 50 条
  • [1] Towards Modeling Manufacturing Flexibility Information in Metalcasting SMEs
    Wadhwa, R. S.
    2012 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2012, : 1396 - 1400
  • [2] Enhancing Manufacturing Flexibility Through Automation Packaged Solution (APS): A Case Study Approach
    Azizpour, Ghazaleh
    Ashourpour, Milad
    Johansen, Kerstin
    SUSTAINABLE PRODUCTION THROUGH ADVANCED MANUFACTURING, INTELLIGENT AUTOMATION AND WORK INTEGRATED LEARNING, SPS 2024, 2024, 52 : 219 - 230
  • [3] The Relationship Between Flexibility of Manufacturing System Components, Competitiveness of SMEs and Business Performance: A Study of Manufacturing SMEs in Northern India
    Kaur S.P.
    Kumar J.
    Kumar R.
    Global Journal of Flexible Systems Management, 2017, 18 (2) : 123 - 137
  • [4] Study on coordination issues for flexibility in supply chain of SMEs: A case study
    Kumar R.
    Singh R.K.
    Shankar R.
    Global Journal of Flexible Systems Management, 2013, 14 (2) : 81 - 92
  • [5] Dashboard for management monitoring RPA- Robotic Process Automation: a study in the manufacturing SMEs
    Montoya, M.
    Rojas, J. A.
    Aguirre, Y. A.
    ENTRE CIENCIA E INGENIERIA, 2024, 18 (35): : 59 - 66
  • [6] LOW COST AUTOMATION FOR CANDY MANUFACTURING: A CASE STUDY
    Ni, Da Feng
    Derby, Stephen J.
    DETC 2008: 32ND ANNUAL MECHANISMS AND ROBOTICS CONFERENCE, VOL. 2, PTS A & B, 2009, : 827 - 832
  • [7] Aligning manufacturing strategy and levels of automation: A case study
    Lindstrom, Veronica
    Winroth, Mats
    JOURNAL OF ENGINEERING AND TECHNOLOGY MANAGEMENT, 2010, 27 (3-4) : 148 - 159
  • [8] A novel energy management system for optimal energy and flexibility scheduling of residential buildings: a case study in HSB Living Lab
    Mazidi, Mohammadreza
    Steen, David
    Le Anh Tuan
    2023 ASIA MEETING ON ENVIRONMENT AND ELECTRICAL ENGINEERING, EEE-AM, 2023,
  • [9] Implementation of Lean Manufacturing in Indian SMEs-A case study
    Ramakrishnan, V
    Jayaprakash, J.
    Elanchezhian, C.
    Ramnath, Vijaya B.
    MATERIALS TODAY-PROCEEDINGS, 2019, 16 : 1244 - 1250
  • [10] Production network flexibility:case study of Norwegian diary production network
    Taravatsadat Nehzati
    Heidi C.Dreyer
    Jan Ola Strandhagen
    AdvancesinManufacturing, 2015, 3 (02) : 151 - 165