Probabilistic Criterion for Expansion and Operation Planning

被引:0
|
作者
Lima, Joao Marcos [1 ]
Schilling, Marcus Th. [2 ]
Lourenco, Elizete M. [3 ]
机构
[1] Copel Cia Paranaense Energia, Rua Pe Agostinho 2600, BR-80710000 Curitiba, Parana, Brazil
[2] Univ Fed Fluminense, BR-22440970 Rio De Janeiro, Brazil
[3] Univ Fed Parana UFPR, BR-81531970 Curitiba, Parana, Brazil
关键词
deterministic criteria; n-1; criterion; n-2; probabilistic planning criterion; probabilistic operation criterion; severity index;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The Brazilian power grid has traditionally been designed and operated by means of a deterministic reliability criteria set. Although these criteria have successfully eliminated system constraints, they have also entailed higher costs, especially those concerning operation planning. That happens because such deterministic criteria allow quantitative and not-qualitative analysis. Their essential weakness is that they cannot recognize the probabilistic or stochastic nature of system behavior, of customers demands, or of a component failures. This article illustrates how probabilistic criteria can replace the existing deterministic approach. Detailed reliability analyses of different load levels in the electric power system of Parana state, Brazil, are used as case study. The proposed approach seems promising in terms of reducing the cost for operation and long-term planning. On the other hand, the system risk level will not experience any significant increase.
引用
收藏
页码:543 / +
页数:2
相关论文
共 50 条
  • [1] A hybrid probabilistic criterion for market-based transmission expansion planning
    Lu, M.
    Dong, Z. Y.
    Saha, T. K.
    2006 POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-9, 2006, : 2875 - +
  • [2] Probabilistic Reliability Criterion for Expansion Planning of Grids Including Wind Turbine Generators
    Cho, Kyeonghee
    Park, Jeongje
    Oh, Taegon
    Choi, Jaeseok
    El-Keib, A. A.
    Shahidehpour, Mohammad
    2011 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2011,
  • [3] A study on probabilistic optimal reliability criterion determination in composite power system expansion planning
    Choi, J
    Thomas, R
    Wang, ZF
    El-Keib, AA
    Billinton, R
    2005 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS, 1-3, 2005, : 1277 - 1284
  • [4] Practical Power System Operation Criterion And Expansion Planning Based Optimal Placement Of Facts Controllers
    Balamurali, G.
    Thanushkodi, K.
    2013 INTERNATIONAL CONFERENCE ON CURRENT TRENDS IN ENGINEERING AND TECHNOLOGY (ICCTET), 2013, : 291 - 295
  • [5] Probabilistic Planning with Risk-Sensitive Criterion
    Hou, Ping
    PROCEEDINGS OF THE TWENTY-NINTH AAAI CONFERENCE ON ARTIFICIAL INTELLIGENCE, 2015, : 4241 - 4242
  • [6] Probabilistic reliability assessment in operation planning
    Lima, J. M.
    Schilling, M. Th
    Lourenco, E. M.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2012, 226 (O1) : 88 - 95
  • [7] PROBABILISTIC SIMULATION METHODS FOR EXPANSION AND LONG-TERM OPERATION PLANNING - A COMPARISON OF DIFFERENT ALGORITHMS
    SCHROEDER, TJ
    ETZ ARCHIV, 1986, 8 (05): : 177 - 183
  • [8] Probabilistic reliability criterion for planning transmission system expansions
    Choi, J.
    Mount, T. D.
    Thomas, R. J.
    Billinton, R.
    IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2006, 153 (06) : 719 - 727
  • [9] Probabilistic criteria for power system expansion planning
    Manso, LAF
    da Silva, AML
    ELECTRIC POWER SYSTEMS RESEARCH, 2004, 69 (01) : 51 - 58
  • [10] Importance of Reliability Criterion in Power System Expansion Planning
    Slipac, Goran
    Zeljko, Mladen
    Sljivac, Damir
    ENERGIES, 2019, 12 (09)