Risk and uncertainty analysis for dam overtopping - Case study: The Doroudzan Dam, Iran

被引:18
|
作者
Goodarzi, Ehsan [1 ]
Lee, Teang Shui [2 ]
Ziaei, Mina [1 ]
机构
[1] Georgia Inst Technol, Dept Civil & Environm Engn, Atlanta, GA 30318 USA
[2] Univ Putra Malaysia, Fac Engn, Dept Water Resources Engn, Serdang 43400, Selangor, Malaysia
关键词
Risk analysis; Uncertainty analysis; Overtopping; Flood; Wind; Reservoir;
D O I
10.1016/j.jher.2013.02.001
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
There is a growing tendency to assess the safety levels of existing dams by using mathematical and statistical methods. In this study, the application of risk and uncertainty analysis to dam overtopping is presented for Doroudzan Reservoir located at the south part of Iran. The main objective of the overtopping analysis of dams is estimating the height of water in the reservoir under various inflows and comparing the computed results with the dam crest elevation. Hence, the main steps of this study include univariate flood frequency analysis of annual maximum inflows to estimate the peak flows in various return periods, generate inflow hydrographs based on the estimated peak flows, and route the hydrographs through the reservoir to compute the maximum height of the water in reservoir. In this study, the spillway discharge coefficient, quantile of peak flows, and initial water surface level are subject to uncertainty, and the Monte-Carlo simulation (MCS) and Latin hypercube sampling (LHS) are applied to perform the uncertainty analysis. In addition to inflows, the effect of different wind speeds on the probability of overtopping has been considered. The results demonstrated that both increasing water level and wind speed have significant impact on the risk of overflowing. (C) 2013 International Association for Hydro-environment Engineering and Research, Asia Pacific Division. Published by Elsevier B.V. All rights reserved.
引用
收藏
页码:50 / 61
页数:12
相关论文
共 50 条
  • [1] Dam overtopping risk using probabilistic concepts - Case study: The Meijaran Dam, Iran
    Goodarzi, Ehsan
    Shui, Lee Teang
    Ziaei, Mina
    AIN SHAMS ENGINEERING JOURNAL, 2013, 4 (02) : 185 - 197
  • [2] Risk analysis for Dam overtopping - Feitsui reservoir as a case study
    Kuo, Jan-Tai
    Yen, Ben-Chie
    Hsu, Yung-Chia
    Lin, Huei-Fen
    JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 2007, 133 (08): : 955 - 963
  • [3] Research on Approach of Uncertainty Analysis for Risk Assessment of Dam Overtopping
    Liu Yanli
    Zhou Huicheng
    Wang Guoqing
    PROCEEDINGS OF THE 4TH INTERNATIONAL YELLOW RIVER FORUM ON ECOLOGICAL CIVILIZATION AND RIVER ETHICS, VOL IV, 2010, : 101 - +
  • [4] Risk analysis for earth dam overtopping
    Mo Chongxun
    Liu Fanggui
    Yu Mei
    Ma Rongyong
    Sun Guikai
    WATER SCIENCE AND ENGINEERING, 2008, 1 (02) : 76 - 87
  • [5] Risk analysis for earth dam overtopping
    Mo Chongxun1
    2. Institute of Soil Science
    WaterScienceandEngineering, 2008, 1 (02) : 76 - 87
  • [6] Overtopping risk analysis for the earth dam of Qinghe Reservoir
    Li, QJ
    Chen, ZH
    Liu, LH
    STOCHASTIC HYDRAULICS '96, 1996, : 371 - 374
  • [7] Uncertainty in dam safety risk analysis
    Baecher, Gregory B.
    GEORISK-ASSESSMENT AND MANAGEMENT OF RISK FOR ENGINEERED SYSTEMS AND GEOHAZARDS, 2016, 10 (02) : 92 - 108
  • [8] Case Study: Dam Safety during Construction, Lessons of the Overtopping Diversion Works at Aguamilpa Dam
    Federal Commission of Electricity , Rio Mississippi No. 71-11° Piso, Col. Cuauhtémoc, D.F., Mexico
    06500, Mexico
    1600, 1121-1127 (2006):
  • [9] Dealing with uncertainty in the probability of overtopping of a flood mitigation dam
    Michailidi, Eleni Maria
    Bacchi, Baldassare
    HYDROLOGY AND EARTH SYSTEM SCIENCES, 2017, 21 (05) : 2497 - 2507
  • [10] Case study: Dam safety during construction, lessons of the overtopping diversion works at Aguamilpa Dam
    Marengo, H.
    JOURNAL OF HYDRAULIC ENGINEERING, 2006, 132 (11) : 1121 - 1127