FITNESS-FOR-SERVICE ASSESSMENT OF A STEAM PIPELINE OPERATING IN THE CREEP RANGE AFTER 230000 HOURS OF SERVICE

被引:0
|
作者
Scano, Lorenzo [1 ]
机构
[1] Integr Engn Studio Tecn Scano Tavagnacco, I-33010 Udine, Italy
关键词
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
High energy pipes, carrying steam at high pressure and temperature, are very common in the industry. In this paper; a Fitness-For-Service assessment was performed for a pipeline connecting the boiler of a paper mill to the cogeneration turbine and the process headers. A pressure of 6.4 MPa and a temperature of 475 degrees C were the operating conditions for 230000 hours of continued service, thus arising concern about metal loss due to erosion/corrosion and high temperature creep damage. Original pipeline design information was unknown, hence, an extensive NDE program was carried out to obtain the required data for the FFS analysis. Because of the elevated number of in-service hours, an API 579-1 Level 3 assessment was required and a FE shell model of the line was set up to evaluate plastic strain accumulation due to creep through a time-dependant inelastic analysis. The predicted critical components were then investigated experimentally taking metallographic replicas in situ and the actual damage was finally, qualitatively, compared, with that calculated with the API 579-1 procedures, with good agreement. The results of the assessment led to an estimate of 70000 hours of residual life for the pipeline and could drive the planning for future NDE according to a RBI approach.
引用
收藏
页码:497 / 506
页数:10
相关论文
共 50 条
  • [1] PROBABILISTIC FITNESS-FOR-SERVICE ASSESSMENT OF PIPELINE
    Semiga, Vlado
    Dinovitzer, Aaron
    PROCEEDINGS OF THE 9TH INTERNATIONAL PIPELINE CONFERENCE - 2012, VOL 4, 2013, : 635 - 644
  • [2] Failure analysis and fitness-for-service assessment for a pipeline
    Feng, YR
    Li, HL
    Zhang, PS
    Du, BP
    Ma, BD
    Jin, ZH
    ENGINEERING FAILURE ANALYSIS, 2001, 8 (04) : 399 - 407
  • [3] Status of fitness-for-service assessment of defected pipeline in China
    Zhao, Xinwei
    Luo, Jinheng
    Dong, Baosheng
    Zhang, Hua
    Zhang, Guangli
    PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE 2007, VOL 6: MATERIALS AND FABRICATION, 2007, : 677 - 686
  • [4] Crack and fitness-for-service assessment of ERW crude oil pipeline
    Lu, SL
    Han, Y
    Qin, CY
    Yuan, PB
    Zhao, XW
    Luo, JH
    ENGINEERING FAILURE ANALYSIS, 2006, 13 (04) : 565 - 571
  • [5] FITNESS-FOR-SERVICE CREEP LIFE EVALUATION OF A HOT REHEAT PIPING SYSTEM AT 400,000 OPERATING HOURS
    Cohn, Marvin J.
    PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE, 2017, VOL 6B, 2017,
  • [6] HANDLING BLUNT FLAWS IN A FITNESS-FOR-SERVICE ASSESSMENT OF PIPELINE WELD QUALITY
    KASEN, MB
    HICHO, GE
    JOURNAL OF MATERIALS ENGINEERING, 1988, 10 (01) : 27 - 36
  • [7] FITNESS-FOR-SERVICE ASSESSMENT OF STEAM GENERATOR TUBING SUBJECT TO DEALLOYING DEGRADATION
    Mousavi, Rosita
    Duan, Xinjian
    Kozluk, Michael
    Wang, Min
    Shi, Yihai
    PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE, 2017, VOL 1A, 2017,
  • [8] FITNESS-FOR-SERVICE ASSESSMENT OF PIPELINE GIRTH WELDS, WITH EMPHASIS ON NONDESTRUCTIVE INSPECTION.
    Reed, R.P.
    Schramm, R.E.
    1986, : 255 - 263
  • [9] Application of instrumented indentation technique for enhanced fitness-for-service assessment of pipeline crack
    Jang, JI
    Choi, Y
    Lee, JS
    Lee, YH
    Kwon, D
    Gao, M
    Kania, R
    INTERNATIONAL JOURNAL OF FRACTURE, 2005, 131 (01) : 15 - 34
  • [10] HANDLING BLUNT FLAWS IN A FITNESS-FOR-SERVICE ASSESSMENT OF PIPELINE WELD QUALITY.
    Kasen, M.B.
    Hicho, G.E.
    1988, 10 (01): : 27 - 36