Integrated Maintenance-Quality policy with rework process under improved imperfect preventive maintenance

被引:38
|
作者
Gouiaa-Mtibaa, A. [1 ]
Dellagi, S. [1 ]
Achour, Z. [1 ]
Erray, W. [2 ]
机构
[1] Lorraine Univ, LGIPM, Metz, France
[2] Credit Agr SA, Paris, Ile De France, France
关键词
Maintenance strategies; Imperfect preventive maintenance; Reworking; Quality; Degradation; ECONOMIC PRODUCTION QUANTITY; STAGE PRODUCTION SYSTEM; LEASED EQUIPMENT; MODEL; REPAIR; STRATEGY; SIZE;
D O I
10.1016/j.ress.2017.12.020
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider a manufacturing system subject to an increasing random failure rate and producing conforming and non-conforming items. Two types of non-defective products are considered: high quality items noted first-rate products and substandard quality items noted second-rate products. Rework activities are proposed for second-rate and non-conforming products in order to improve their quality conditions and sell them at the best price, In order to slow down the degradation process of the manufacturing system and reduce its impact on the quality of output products, a new improved imperfect preventive maintenance (PM) policy with minimal repair at failures is established. It consists in performing a given number of imperfect PM actions before undertaking a perfect one. This study consists in developing an analytical model to determine simultaneously the optimal values of two decision variables: the number of produced batches before performing the imperfect PM, and the number of imperfect PM actions to undertake before applying a perfect one by maximizing the total expected profit taking into account the selling price and production, maintenance and reworking costs. Numerical examples and a sensitivity study are presented to illustrate the use of the proposed model and the obtained results. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1 / 11
页数:11
相关论文
共 50 条
  • [1] An economic manufacturing quantity model with rework process for deteriorating products under maintenance-quality policy
    Salmasnia, Ali
    Hajihosseini, Zahra
    Maleki, Mohammad Reza
    INTERNATIONAL JOURNAL OF MODELLING AND SIMULATION, 2022, 42 (06): : 946 - 965
  • [2] Development of Integrated Maintenance-Quality Policy according to imperfect quality item produced
    Gouiaa-Mtibaa, Amal
    Dellagi, Sofiene
    Achour, Zied
    Erray, Walid
    IFAC PAPERSONLINE, 2016, 49 (12): : 1400 - 1405
  • [3] Sequential imperfect preventive maintenance policy with random maintenance quality under reliability limit
    Wang, Z.
    Yang, J.
    Wang, G.
    Zhang, G.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART C-JOURNAL OF MECHANICAL ENGINEERING SCIENCE, 2011, 225 (C8) : 1926 - 1935
  • [4] Joint Integrated Maintenance-Quality Policy with reworking activity
    Gouiaa-Mtibaa, Amal
    Dellagi, Sofiene
    Achour, Zied
    Erray, Walid
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 1336 - 1342
  • [5] OPTIMAL MAINTENANCE POLICY WITH IMPERFECT PREVENTIVE MAINTENANCE
    NGUYEN, DG
    MURTHY, DNP
    IEEE TRANSACTIONS ON RELIABILITY, 1981, 30 (05) : 496 - 497
  • [6] AN INTEGRATED MODEL OF PRODUCTION SCHEDULING AND MAINTENANCE PLANNING UNDER IMPERFECT PREVENTIVE MAINTENANCE
    Chen, Xiaohui
    Xiao, Lei
    Zhang, Xinghui
    Xiao, Weixiao
    Li, Junxing
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2015, 17 (01): : 70 - 79
  • [7] A Modified Imperfect Preventive Maintenance Policy under Reliability Limit
    Chen, M.
    Wang, M.
    Chien, Y. H.
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 581 - +
  • [8] Integrated Maintenance-Quality strategies with reworking activities
    Gott-Mtibaa, A.
    Dellagi, S.
    Achour, Z.
    Erray, W.
    IFAC PAPERSONLINE, 2016, 49 (28): : 61 - 66
  • [9] An optimal sequential preventive maintenance policy under stochastic maintenance quality
    Liu, Yu
    Li, Yanfeng
    Huang, Hong-Zhong
    Kuang, Yuanhui
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2011, 7 (04) : 315 - 322
  • [10] Integrated maintenance-quality policy taking into account the economical impact of reworking activities
    Gouiaa-Mtibaa, A.
    Dellagi, S.
    Achour, Z.
    Erray, W.
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE-OPERATIONS & LOGISTICS, 2018, 5 (04) : 339 - 355