AUTOMATED CREATION OF THE PIPELINE DIGITAL TWIN DURING CONSTRUCTION - IMPROVEMENT TO CONSTRUCTION QUALITY AND PIPELINE INTEGRITY

被引:0
|
作者
Hlady, Joseph [1 ]
Glanzer, Matt [2 ]
Fugate, Lance [2 ]
机构
[1] Infrastruct Mapping & Auton, Calgary, AB, Canada
[2] Lux Modus, Calgary, AB, Canada
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The concept of the digital twin dates all the way back to the 1950's when NASA, GE and other industrial manufacturers started creating abstract digital models of equipment to model their performance in simulations and maintain a record of the asset throughout its life span [1]. Over the years more and more industries have adopted the digital twin paradigm to improve traceability, maintenance, and analytics allowing for improved sustainment of the asset or equipment while reducing various risks identified during life cycle management. It has been found that collectively, the digital twin concept improves the overall net present value of an asset. The oil and gas industry has slowly been adopting the digital twin paradigm of asset life cycle management over the past two decades with the focus on facilities. Recently, field trials were completed to test and evaluate workflows and sensor platforms for the creation of a digital twin for pipelines. The trials resulted in highly accurate pipeline centerlines, weld locations, Depth to Cover (DoC) and ditch geometry capture in digital formats. This paper describes the methodologies used, and the results of an actual construction field trial with a comparison to traditional data collection methods for these attributes. The value of creating a pipeline digital twin during pipeline construction in near-real-time is discussed with an emphasis on the potential benefits to life cycle management and pipeline integrity.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] QUALITY CONTROL IN PIPELINE CONSTRUCTION
    BELL, DW
    SNOWSILL, BA
    CHEMICAL AND PROCESS ENGINEERING, 1969, 50 (11): : 91 - &
  • [2] PIPELINE INTEGRITY ANALYSES FOR CONSTRUCTION IN MOUNTAINOUS AREAS
    Zhang, Fan
    Liu, Ming
    Wang, Yong-Yi
    Surface, Ryan
    Phillips, Adam
    PROCEEDINGS OF THE 10TH INTERNATIONAL PIPELINE CONFERENCE - 2014, VOL 1, 2014,
  • [3] Temporary CP during pipeline construction
    不详
    MATERIALS PERFORMANCE, 2005, 44 (01) : 35 - 37
  • [4] The use of automated ultrasonic testing (AUT) in pipeline construction
    Morgan, L
    Nolan, P
    Kirkham, A
    Wilkinson, R
    INSIGHT, 2003, 45 (11) : 746 - 753
  • [5] An automated pipeline for standardized biomedical knowledge graph construction
    Rainford, Jethro
    Ahn, Joo Wook
    Garner, Matthew
    EUROPEAN JOURNAL OF HUMAN GENETICS, 2024, 32 : 671 - 672
  • [6] An automated pipeline for standardized biomedical knowledge graph construction
    Santos-Pereira, Ana
    Vilela, Joana
    Marques, Ana Rita
    Santos, Joao Xavier
    Rasga, Celia
    Vicente, Astrid
    Martiniano, Hugo
    EUROPEAN JOURNAL OF HUMAN GENETICS, 2024, 32 : 671 - 671
  • [7] Construction of pipeline crossings by means of automated shield-passing by pipeline and pipe sections
    Shatalov, Dmitry A.
    Vafin, Dinar R.
    Shamanin, Andrey R.
    NAUKA I TEHNOLOGII TRUBOPROVODNOGO TRANSPORTA NEFTI I NEFTEPRODUKTOV-SCIENCE & TECHNOLOGIES-OIL AND OIL PRODUCTS PIPELINE TRANSPORTATION, 2022, 12 (06): : 550 - 559
  • [8] Improvement of Pipeline Construction Planning through Optimised Scheduling
    夏正兵
    张珂峰
    读与写(教育教学刊), 2014, 11 (05) : 14 - 16
  • [9] Pipeline construction forecast
    Watts, Jim, 1600, (217):
  • [10] OFFSHORE PIPELINE CONSTRUCTION
    WATTS, J
    PIPELINE & GAS JOURNAL, 1984, 211 (04) : 17 - &