Field Evaluation of Staged Concrete Bridge Deck Pours Adjacent to Live Traffic

被引:3
|
作者
Weatherer, Peter J. [1 ]
Hedegaard, Brock D. [2 ,3 ]
机构
[1] Smislova Kehnemui & Associates PA, 12435 Pk Potomac Ave 300, Potomac, MD 20854 USA
[2] Univ Minnesota Duluth, Dept Civil Engn, 1405 Univ Dr, Duluth, MN 55812 USA
[3] Univ Wisconsin Madison, Dept Civil & Environm Engn, Madison, WI 53706 USA
关键词
Staged construction; Bridge decks; Field inspections;
D O I
10.1061/(ASCE)BE.1943-5592.0001367
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Staged construction is the practice in which traffic is maintained on a bridge while it is constructed in phases. When cast-in-place concrete decks are used with staged construction, the concrete deck must cure while subjected to loads and displacements caused by the adjacent traffic using the same structure. Traffic-induced displacements and vibrations may damage the freshly placed concrete, its bond with the embedded reinforcement, or the integrity of the concrete joint. To determine the effects, if any, of staged construction practices on long-term bridge performance, this research examined bridge decks in Wisconsin that were constructed or widened using staged construction through visual inspection, field monitoring, and finite-element modeling. Some minor defects were observed in the field inspections of slab-on-girder bridges, such as underconsolidated concrete in the construction joint region and leakage through the joint itself. The inspected haunched-slab bridges showed severe deterioration at the construction joints. Field-measured differential displacements were small, with a maximum of 1.1mm (0.043 in.), both during construction and several weeks after. Finite-element modeling confirmed these observations. Modeling results indicated that as long as nominal stiffness was provided by the deck or even the formwork between girders adjacent to the longitudinal joint, these deflections were unlikely to cause deterioration. Longer-span bridges may experience larger differential displacements across the joint, but these may be controlled by preventing larger vehicles from using the lane adjacent to the fresh concrete for approximately one day. (c) 2019 American Society of Civil Engineers.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Live-load distribution of an adjacent box-beam bridge: Influence of bridge deck Live-load distribution of an adjacent box-beam bridge: Influence of bridge deck
    Whelchel, Ryan T.
    Williams, Christopher S.
    Frosch, Robert J.
    PCI JOURNAL, 2021, 66 (06): : 51 - 71
  • [2] Nondestructive Evaluation of Concrete Bridge Deck with Overlays
    Azari, Hoda
    Shams, Sadegh
    Public Roads, 2022, 86 (03) : 24 - 30
  • [3] Field and laboratory evaluation of silica fume modified concrete bridge deck overlays in Ohio
    Fitch, MG
    Abdulshafi, OA
    CONCRETE IN CONSTRUCTION, 1998, (1610): : 20 - 27
  • [4] Mechanical Evaluation of Concrete Bridge Deck Pavement Systems
    Raab, Christiane
    Partl, Manfred N.
    JOURNAL OF TESTING AND EVALUATION, 2020, 48 (01) : 211 - 222
  • [5] ANDERS: future of concrete bridge deck evaluation and rehabilitation
    Gucunski, Nenad
    Moon, Franklin
    NONDESTRUCTIVE CHARACTERIZATION FOR COMPOSITE MATERIALS, AEROSPACE ENGINEERING, CIVIL INFRASTRUCTURE, AND HOMELAND SECURITY 2011, 2011, 7983
  • [6] Impact of adjacent lane traffic on the serviceability of concrete bridge decks
    Department of Civil and Environmental Engineering, Florida International University, United States
    不详
    Am. Concr. Inst. ACI Spec. Publ., 284 SP (9-21):
  • [7] Field Destructive Testing of a Reinforced Concrete Bridge Deck Slab
    Shu, Jiangpeng
    Bagge, Niklas
    Nilimaa, Jonny
    JOURNAL OF BRIDGE ENGINEERING, 2020, 25 (09)
  • [8] Field testing of FRP rebar reinforced concrete bridge deck
    Thippeswamy, H
    Franco, J
    GangaRao, H
    MATERIALS AND CONSTRUCTION: EXPLORING THE CONNECTION, 1999, : 316 - 323
  • [9] Monitoring of Field Performance of Longitudinally Cracked Concrete Bridge Deck
    William, G. W.
    Shoukry, S. N.
    Riad, M. Y.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, RESILIENCE AND SUSTAINABILITY, 2012, : 3984 - 3991
  • [10] Performance evaluation of concrete bridge deck affected by chloride ingress
    Konecny, P.
    Tikalsky, P. J.
    Tepke, D. G.
    TRANSPORTATION RESEARCH RECORD, 2007, (2028) : 3 - 8