FEEDWATER HEATER STUDY FOR AN EXTENDED POWER UPRATE AT A NUCLEAR POWER STATION

被引:0
|
作者
Svensson, Eric [1 ]
Krishnamoorthy, Aravind
Catapano, Michael [1 ]
Coakley, Michael
Thomas, Dan
机构
[1] Powerfect Inc, Brick, NJ USA
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Given today's nuclear industry business climate, it has become very popular and financially advantageous for Utility companies to consider increasing unit capacities. An integral part of the studies conducted by many towards this end, involve the generation of a set of turbine cycle heat balances with predicted performance parameters for the uprated condition. Once these tentative operating values are established, it becomes necessary to evaluate the suitability of the existing components within each system to ensure they are capable of continued safe and reliable operation. The ultimate cost for the uprate, including the cost for any major required modifications or significant replacements is weighed against increased revenue generated from the uprate over time. Exelon's Peach Bottom Atomic Power Station (PBAPS) is currently planning for an Extended Power Uprate (EPU) for both units. To ensure the existing Feedwater Heaters (FWH) could maintain the operating and transient response margins at the EPU condition, an engineering study was conducted. Powerfect Inc. in conjunction with SPX Heat Transfer Inc. were contracted to provide engineering services to analyze the design, thermal performance, reliability and operating conditions at projected EPU conditions. The goal of the study was to identify the most susceptible areas within the heaters for problems and potential failures when operating at the higher duty of the EPU condition for the remaining life of the Unit. Various calculation methods were employed to evaluate critical parameters and quantify the effect of the EPU operating condition on each individual FWH. The results were based on each heater's current condition and comparison of calculated values of several parameters against industry standards (i.e. HEI, TEMA, EPRI) in order to determine the acceptability for continued operation of the Station's existing 30 FWHs. Recommendations for additional monitoring, heater modification, or heater replacement were provided based on the margin by which each heater approached or exceeded the established limits. This paper shall describe the approach taken to evaluate the above parameters for each FWH at the estimated EPU conditions.
引用
收藏
页码:197 / 202
页数:6
相关论文
共 50 条
  • [1] CFD investigating the influence of power uprate on impingement wear sites for the feedwater heater in the nuclear power plant
    Ferng, Y. M.
    NUCLEAR ENGINEERING AND DESIGN, 2009, 239 (02) : 231 - 238
  • [2] Power uprate operation at Chinshan Nuclear Power Station
    Chan, Yea-Kuang
    Tsai, Yu-Ching
    NUCLEAR ENGINEERING AND DESIGN, 2019, 343 : 96 - 102
  • [3] Grand Gulf Nuclear Station Power Uprate
    Becker, Ann Day
    POWER ENGINEERING, 2010, 114 (08) : 36 - +
  • [4] EXPERIENCE WITH EXTENDED POWER UPRATE AT LEIBSTADT NUCLEAR POWER PLANT
    Engel, Robert
    Zichanowicz, Karl
    PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE, VOL 7, 2009, : 71 - 78
  • [5] Optimizing feedwater heater operation in a nuclear power plant
    Fitzgerald, Bill
    Proceedings of the ASME Power Conference 2005, Pts A and B, 2005, : 135 - 137
  • [6] Dynamic Simulation on Feedwater Heater of Nuclear Power Plant
    Wang, Chunguo
    Yu, Rui
    Zhang, Kelong
    MANUFACTURING ENGINEERING AND AUTOMATION II, PTS 1-3, 2012, 591-593 : 535 - 540
  • [7] FeedWater System Transient Analysis of Nuclear Power Station
    Zhang, Shaobo
    Luo, Bixiong
    Qiao, Xubin
    Chen, Juan
    Wang, Xiaodong
    RENEWABLE AND SUSTAINABLE ENERGY, PTS 1-7, 2012, 347-353 : 1557 - 1560
  • [8] CATASTROPHIC HIGH PRESSURE FEEDWATER HEATER OVERPRESSURE EVENT AT STUART POWER STATION
    Michell, Frank
    PROCEEDINGS OF THE ASME 2022 POWER CONFERENCE, POWER2022, 2022,
  • [9] Some power uprate issues in nuclear power plants
    Tipping, Philip
    NUCLEAR ENGINEERING AND TECHNOLOGY, 2008, 40 (04) : 251 - 254
  • [10] BWR steam dryer for extended power uprate
    Le Moigne, Yann
    Andren, Anders
    Greis, Ingemar
    Kornfeldt, Hans
    Sundlof, Per
    Sjunnesson, Jan
    Karlsson, Anna-Karin
    NUCLEAR ENGINEERING AND DESIGN, 2008, 238 (08) : 2106 - 2114