Scheduling dynamic hybrid flowshop with serial batching machines

被引:18
|
作者
Xuan, H. [1 ]
Li, B. [1 ]
机构
[1] Zhengzhou Univ, Zhengzhou 450001, Henan, Peoples R China
基金
中国国家自然科学基金;
关键词
LAGRANGIAN-RELAXATION; BOUND ALGORITHM; TARDINESS;
D O I
10.1057/jors.2012.64
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper considers a multi-stage dynamic hybrid flowshop in which some stage contains several identical batching machines and the other stages contain several identical discrete machines. Each discrete machine can process no more than one operation at a time, and each batching machine can process several jobs continuously in a batch. This problem has a strong practical background in the process industry. Since the problem is NP-hard, improved Lagrangian relaxation (LR) is developed where batch decomposition strategy is applied and mixed backward and forward dynamic programming is designed to solve batch-level subproblems with the case that each operation may have multiple predecessors and successors. Results of numerical experiments with up to 60 jobs show that the proposed algorithm can obtain better solutions in a reasonable computation time than traditional LR.
引用
收藏
页码:825 / 832
页数:8
相关论文
共 50 条
  • [1] Scheduling hybrid flowshop with parallel batching machines and compatibilities
    Bellanger, A.
    Oulamara, A.
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (06) : 1982 - 1992
  • [2] Dynamic Hybrid Flowshop Scheduling with Batching Production
    Cao, Ying
    Xuan, Hua
    Liu, Jing
    MECHATRONIC SYSTEMS AND AUTOMATION SYSTEMS, 2011, 65 : 562 - 567
  • [3] Appling Metaheuristic Algorithms on a Two Stage Hybrid Flowshop Scheduling Problem with Serial Batching
    Ghafari, E.
    Sahraeian, R.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2014, 27 (06): : 899 - 909
  • [4] Flowshop scheduling problems with transportation or deterioration between the batching and single machines
    Tang, Lixin
    Liu, Peng
    COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (04) : 1289 - 1295
  • [5] Three-stage HFS scheduling problem with serial batching machines
    Xuan, Hua
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (05): : 1006 - 1010
  • [6] Two-machine flowshop batching and scheduling
    Lin, BMT
    Cheng, TCE
    ANNALS OF OPERATIONS RESEARCH, 2005, 133 (1-4) : 149 - 161
  • [7] Two-Machine Flowshop Batching and Scheduling
    B. M. T. Lin
    T. C. E. Cheng
    Annals of Operations Research, 2005, 133 : 149 - 161
  • [8] Dynamic set-up rules for hybrid flow shop scheduling with parallel batching machines
    Rossi, Andrea
    Pandolfi, Andrea
    Lanzetta, Michele
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (13) : 3842 - 3857
  • [9] New benchmark algorithm for hybrid flowshop scheduling with identical machines
    Lin, Shih-Wei
    Cheng, Chen-Yang
    Pourhejazy, Pourya
    Ying, Kuo-Ching
    Lee, Chia-Hui
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 183
  • [10] Lookahead batching heuristic for batch scheduling problem of two-stage hybrid flowshop
    Chi Y.
    Liu J.
    Chen Q.
    Mao N.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (10): : 2559 - 2570