Addressing Risks in Green Retrofit Projects: The Case of Singapore

被引:85
|
作者
Hwang, Bon-Gang [1 ]
Zhao, Xianbo [2 ]
See, Yi Lin [3 ]
Zhong, Yun [4 ,5 ]
机构
[1] Natl Univ Singapore, Dept Bldg, Singapore 117548, Singapore
[2] Cent Queensland Univ, Sch Engn & Technol, Sydney, NSW, Australia
[3] EC Harris, Singapore, Singapore
[4] Chongqing Univ, Fac Construct Management & Real Estate, Chongqing, Peoples R China
[5] Chongqing Univ, Int Res Ctr Sustainable Built Environm, Chongqing, Peoples R China
关键词
green building; retrofit; risk management; risk criticality; risk mitigation; CONSTRUCTION PROJECTS; SCHEDULE PERFORMANCE; MANAGEMENT; CONTRACTORS; CONCRETE; FUTURE;
D O I
10.1002/pmj.21512
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The objectives of this study are to identify the risks in green retrofit projects in Singapore; analyze their risk criticalities; compare the risk criticalities between conventional and green retrofit projects; and provide mitigation measures for the critical risks. Twenty risks and 37 mitigation measures were identified from a literature review. A questionnaire survey was performed with 30 professionals experienced in green retrofits, and five post-survey interviews were conducted. The results indicated post-retrofit tenants' cooperation risk was the top risk, and that 19 risks were more critical in green retrofits than in conventional retrofits. Additionally, 28 mitigation measures obtained significant agreement.
引用
收藏
页码:76 / 89
页数:14
相关论文
共 50 条
  • [1] An Exploratory Analysis of Risks in Green Residential Building Construction Projects: The Case of Singapore
    Hwang, Bon-Gang
    Shan, Ming
    Phua, Helena
    Chi, Seokho
    SUSTAINABILITY, 2017, 9 (07)
  • [2] Investigating residents' perceptions of green retrofit program in mature residential estates: The case of Singapore
    Hwang, Bon-Gang
    Shan, Ming
    Xie, Sijia
    Chi, Seokho
    HABITAT INTERNATIONAL, 2017, 63 : 103 - 112
  • [3] Factors Affecting Productivity in Green Building Construction Projects: The Case of Singapore
    Hwang, Bon-Gang
    Zhu, Lei
    Ming, Jonathan Tan Tzu
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (03)
  • [4] Performance risks of lighting retrofit in Energy Performance Contracting projects
    Lee, P.
    Lam, P. T., I
    Lee, W. L.
    ENERGY FOR SUSTAINABLE DEVELOPMENT, 2018, 45 : 219 - 229
  • [5] Project Management Factors Affecting Green Building Projects: Case Study of Singapore
    Li, Yuanyuan
    Chen, Po-Han
    Chew, David Ah Seng
    Teo, Chee Chong
    Xu, Youquan
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2346 - +
  • [6] A NEW METHODOLOGY FOR ADDRESSING CLIENT RISKS IN CONSTRUCTION PROJECTS
    Albogamy, Abdullah
    Dawood, Nashwan
    Scott, Darren
    SUSTAINABLE SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2014, : 489 - 494
  • [7] A fuzzy synthetic evaluation approach for risk assessment: a case of Singapore's green projects
    Zhao, Xianbo
    Hwang, Bon-Gang
    Gao, Yan
    JOURNAL OF CLEANER PRODUCTION, 2016, 115 : 203 - 213
  • [8] Green Roof Retrofit: A Case Study
    Rahman, Md Motiar
    Shams, Shahriar
    Ismail, Pengiran Haji Ros Ismandi Pengiran
    INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2021, 13 (07): : 81 - 88
  • [9] A risk-responsive framework for green retrofit projects in Sri Lanka
    Ranawaka, Indeewari
    Mallawaarachchi, Harshini
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2018, 8 (05) : 477 - 490
  • [10] Risks faced by Singapore firms when undertaking construction projects in India
    Department of Building, National University of Singapore, School of Design and Environment, 4 Architecture Drive, Singapore 117566, Singapore
    不详
    Int. J. Proj. Manage., 2006, 3 (261-270):